Yale MW 5000 Operating Instructions Manual Download Page 19

*Diese Niederlassungen gehören der Matrix-Zertifizierung nach EN ISO 9001:ff an.

*These subsidiaries belong to the matrix-certification-system according to EN ISO 9001:ff.

Tec

hnisc

he Änder

ung

en v

or

behalt

en. K

eine Ge

w

ähr

leis

tung für Dr

uc

kf

ehler oder Ir

rtümer – Sub

ject t

o engineer

ing c

hang

es and im

pr

ov

ements. N

o w

ar

rant

y f

or pr

inting er

ror

s or mis

tak

es.

Reproduktionen, gleich welcher Art, nur mit schriftlicher Genehmigung der Columbus McKinnon Industrial Products GmbH!

Reproduction of any kind, only with written authorisation of Columbus McKinnon Industrial Products GmbH!

Germany

Columbus McKinnon  
Industrial Products GmbH*

Am Lindenkamp 31 
42549 Velbert 
Phone: +49 (0) 20 51/600-0 
Web Site: www.cmco.eu 

Columbus McKinnon  
Engineered Products GmbH*

Am Silberpark 2-8 
86438 Kissing 
Phone: +49 (0) 82 33/21 21-888 
Web Site: www.pfaff-silberblau.com 

France

Columbus McKinnon France SARL*

Zone Industrielle des Forges 
18108 Vierzon Cedex 
Phone: +33 (0) 248/71 85 70 
Web Site: www.cmco-france.com 

United Kingdom

Yale Industrial Products

A trading division of

Columbus McKinnon Corporation Ltd.*

Knutsford Way, Sealand Industrial Estate 
Chester CH1 4NZ 
Phone: +44 (0) 1244 375375 
Web Site: www.yaleproducts.com 

Yale Industrial Products  
(Northern Ireland)

A trading division of

Columbus McKinnon Corporation Ltd.

Unit 1A, The Ferguson Centre 
57-59 Manse Road, Newtownabbey, BT36 6RW 
Phone: +44 (0) 2890 840697 
Web Site: www.yaleproducts.com 

Spain and Portugal

Columbus McKinnon Ibérica S.L.U.

Ctra. de la Esclusa, 21 acc. A 
41011 Sevilla 
Phone: +34 954 29 89 40 
Web Site: www.yaleiberica.com 

Columbus McKinnon Ibérica S.L.U.

Rua Poseidón, 2 (Polg. Icaria) 
15179 Perillo-Oleiros (A Coruña) 
Phone: +34 981 63 95 91 
Web Site: www.yaleiberica.com 

Columbus McKinnon Ibérica S.L.U.

Polg. Ind. Empresarium 
Calle Retama, no 25 - Nave B-19 
50720 Zaragoza 
Phone: +34 876 26 26 75 
Web Site: www.yaleiberica.com

Austria

Columbus McKinnon Austria GmbH*

Gewerbepark, Wiener Straße 132a 
2511 Pfaffstätten 
Phone: +43 (0) 22 52/4 60 66-0 
Web Site: www.yale.at 

Switzerland

Columbus McKinnon Switzerland AG

Dällikerstraße 25 
8107 BUCHS/ZH 
Phone: +41 (0) 44 8 51 55 77 
Web Site: www.cmco.ch 

Poland

Columbus McKinnon Polska Sp.z.o.o.

Ul. Owsiana 14 
62-064 Plewiska 
Phone: +48 (0) 61 6 56 66 22 
Web Site: www.pfaff.info.pl 

Hungary

Columbus McKinnon Hungary Kft.

Vásárhelyi út 5. Vl ép 
8000 Székesfehérvár 
Phone: +36 (22) 546-720 
Web Site: www.yale.de 

South Africa

Columbus McKinnon Corporation (Pty) Ltd.*

P.O. Box 15557 
Westmead, 3608 
Phone: +27 (0) 31/700 43 88 
Web Site: www.cmworks.co.za 

Yale Engineering Products (Pty) Ltd.

12 Laser Park Square, 34 Zeiss Rd. 
Laser Park Industrial Area, Honeydew 
Phone: +27 (0) 11/794 29 10 
Web Site: www.yalejhb.co.za 

Yale Lifting & Mining Products (Pty) Ltd.

P.O. Box 592 
Magaliesburg, 1791 
Phone: +27 (0) 14/577 26 07 
Web Site: www.yale.co.za

Italy

Columbus McKinnon Italia S.r.l.

Via P. Picasso, 32 
20025 Legnano (MI) 
Phone: + 39 (0) 331/57 63 29 
Web Site: www.cmworks.com 

Netherlands

Columbus McKinnon Benelux B.V.*

Grotenoord 30 
3341 LT Hendrik Ido Ambacht 
Phone: +31 (0) 78/6 82 59 67 
Web Site: www.yaletakels.nl 

Russia

Columbus McKinnon Russia LLC

Chimitscheski Pereulok, 1, Lit. AB 
Building 72, Office 33 
198095 St. Petersburg 
Phone: +7 (812) 322 68 38 
Web Site: www.yale.de 

China

Hangzhou LILA Lifting and Lashing Co. Ltd.*

Nanhuan Road, Zhijiang Hi-tech Park 
Hangzhou High-tech Industry Development Zone 
Zhejiang Province 
Phone: +86 10 85 23 63 86 
Web Site: www.yale-cn.com 

Columbus McKinnon (Hangzhou) 
Industrial Products Co. Ltd.*

Xiaoshan, Yiqiao, Zhejiang Province 
Postcode 311256 
Phone: +86 10 85 23 63 86 
Web Site: www.yale-cn.com 

Pfaff-silberblau China

3350 Nanhuan Rd. Zhijiang Industrial Park 
Hangzhou Hi-tech Zone 
Zhejiang Province, 310053 
Phone: +86 57 18 77 58 548 
Web Site: www.pfaff-silberblau.com 

Thailand

Yale Industrial Products Asia Co. Ltd.*

525 Raj-u-thit Road 
Hatyai, Songkhla 90110 
Phone: +66 (0) 74 25 27 62 
Web Site: www.yale-thailand.com

Summary of Contents for MW 5000

Page 1: ...trucciones de Servicio Gebruiksaanwijzing D GB E NL Mod MWW Columbus McKinnon Industrial Products GmbH Postfach 10 13 24 D 42513 Velbert Germany Am Lindenkamp 31 D 42549 Velbert Germany 49 2051 600 0 Fax 49 2051 600 127 Ident No 09901098 08 2011 ...

Page 2: ... bewegen die nicht eingesehen werden können Gesamter Hubbereich muss einsehbar sein Das Seil dient nur zum Heben und Senken bzw Ziehen diverser Lasten und darf zu nichts anderem verwendet werden mind 3 Seilwindungen müssen bei Last in unterster Stellung immer auf der Trommel bleiben Seilabweichungswinkel siehe Bild bei Standardseil 3 bei Spezialseil 1 5 regelmäßig nach DIN 15020 Teil 2 prüfen und ...

Page 3: ...ung an Wänden Masten und dergleichen Die Kurbelarmlänge ist zum Angleichen an die Last in der Länge verstellbar Die Lagerung der Schneckenwelle sowie der Seiltrommel erfolgt über Walz bzw Gleitlager Typen MWW 2000 MWW 3000 MWW 5000 ist zusätzlich zum Lastgang mit einem Schnellgang ausgestattet Einbauanleitung Montage BEACHTE Anbaukonstruktionen für max Kräfte auslegen Unbedingt auf ebene Anschraub...

Page 4: ...rüfung Seil Haken Tragmittel Funktion der Winde täglich Bremsfunktion Verzahnung abschmieren Lastdruckbremse auf Bremsfunktion und Verschleiß prüfen Falls erforderlich Bremsscheiben vom Fachmann 1 wechseln lassen bzw ganze Lastdruckbremse austauschen 1 Achtung Kein Schmiermittel an Bremsscheiben und deren Anlaufflächen Seil gemäß DIN 15020 Blatt 2 auf Verschleiß und auf minimale Bruchkraft prüfen ...

Page 5: ...ht gehalten Seil falsch aufgewickelt Drehrichtung beim Heben falsch Bremse verschlissen oder defekt Seil richtig auflegen entspr Abb Seite 3 Bremsteile prüfen und verschlissene Teile erneuern Lastdruckbremse öffnet nicht Last läßt sich nur unter gro ßem Kraftaufwand absenken Bremsscheiben bzw Bremsmecha nismus verspannt Bremse durch leichten Schlag mit Hand fläche auf Kurbelarm in Senkrichtung lös...

Page 6: ...must not be left suspended without supervision must not be allowed to swing must not fall into the wire rope The rope should only be used for lifting lowering or pulling of various loads and must not be used for any other purpose at least 3 full turns of rope should remain on the drum when loaded fleet angle see Picture for standard wire rope 3 for special rope 1 5 when filled to its capacity the ...

Page 7: ...nches with worm gear The load is automatically held by load pressure brake The winch housing is made of plated steel and is suitable for mounting especially onto walls masts and similar installations The length of the crank arm is to be adapted to the load and therefore adjustable in the length The bearing of the worm shaft as well as the rope drum is through rolling bearing respectively friction ...

Page 8: ...5 of the nominal load must be on the winch as load for the proper working of the friction brake Safety Instruction The winches are only suited for manual operation Lifting the load by turning the crank in clockwise direction Lowering the load by turning the crank in counter clockwise direction Inspection and Maintenance Instructions Safety Instruction Before carrying out inspection and maintenance...

Page 9: ...as distorted during mount ing Check the fixing Is the mounting sur face even are the screws tightened correctly Wrong coiling of the rope winding Direction for lifting was not correct Lay the rope correctly see picture on page 7 Load is not held Brake is work out or defect Examine brake parts and replace worn out parts The load pressure brake does not release load may only be lowered with high exp...

Page 10: ... el cable EL CABLE Debe usarse sólo para elevar bajar o tirar de car gas y nunca debe ser usado para otro propósito Deben quedar por lo menos 3 vueltas completas en el tambor cuando esté con carga ángulo de desviación ver dibujo para el cable estándar es de 3º para cable especial es de 1 5º cuando esté a tope de capacidad los bordes del tambor deben sobresalir no menos de 1 5 veces el diámetro del...

Page 11: ...ión a los datos técnicos del cable Calcular la longitud del cable de forma que queden 3 vueltas completas en el tambor cuando esté completa mente desenrollado INSTRUCCIONES DE USO Antes de su primer uso cargar un 50 de su capacidad nominal con min 3 vueltas del tambor Procurar que el engranaje helicoidal este bien engrasado y que la grasa después del transporte y o almacenamiento este en su sitio ...

Page 12: ...rsona competente Atención No deben aplicarse lubricantes en los discos de freno Examinar el desgaste del cable de acuerdo al DIN 15020 Pág 2 y llevar a cabo trabajos de mantenimiento Comprobar los tornillos de fijación Anual Comprobar el desgaste de todas las partes del torno mural y la palanca Si es necesario reemplazar las partes defectuosas o efectuar el engrase de las mismas Usar solo las gras...

Page 13: ...n toestand laten hangen niet laten schommelen mag niet in de kabel vallen niet in het gebied bewegen dat niet overzichtelijk is Totale hijshoogte moet overzichtelijk zijn DE KABEL dient alleen voor hijsen en dalen of trekken van verschillende lasten en mag voor niets anders gebruikt worden minstens 3 veiligheidswindingen moeten onder last op de eerste laag van de trommel blijven De zijdelingse afl...

Page 14: ...ten en dergelijke De slinger is in lengte verstelbaar De wormas en trommel zijn gelagerd De lieren met een capaciteit van 2000 3000 en 5000 kg zijn voorzien van een tweede aandrijfas MONTAGE INSTRUCTIE De lier dient gemonteerd te worden met de in tabel aangegeven bouten Om zeker te zijn van een juiste werking en om het optreden van spanningen in het lierhuis te voorkomen dient nauwkeurig gelet te ...

Page 15: ...methode ontlast worden Inspectie interval Onderhoud en inspectie werkzaamheden dagelijks Visueel kabel en haken Functie van de lier Remfunctie per kwartaal Wormoverbrenging invetten Lastdrukrem en remfunctie op slijtage keuren Indien nodig remschijven door een vakman omwisselen laten of eventueel een complete lastdrukrem laten vervangen Pas op Geen smeermiddel op de remschijven of aanloopvlakken K...

Page 16: ...ordt niet vastgehouden De kabel is verkeerd op de trommel gewikkeld waardoor de draairichting van de slinger verkeerd om is Lastdrukremschijven versleten of defecte remschijven De kabel juist aanbrengen Schijven keuren en vervangen Lastdrukrem treedt niet in werking Remmechanisme en of schijven vastgeklemd ten gevolge van gering gebruik De rem lossen door een tik met vlakke hand op de slingerarm i...

Page 17: ... 98 37 EG Angewandte Normen ISO 12100 EN 349 EN 12385 EN 13157 DIN 15020 DIN 15400 DIN 15404 BGV D8 BGR 258 Qualitätssicherung DIN EN ISO 9001 Zertifikat Registrier Nr 151 EC Declaration of Conformity 98 37 EEC Appendix II A We hereby declare that the design construction and commercialised execution of the below mentioned machine complies with the essential health and safety requirements of the EC...

Page 18: ... EG Conformiteitsverklaring 98 37 EG Appendix II A Hiermede verklaren wij dat het ontwerp constructie en uitvoering van de hieronder vermelde machine voldoen aan de toepasselijke veilligheids en gezondheidseisen van de EG Machinerichtlijn De geldigheid van deze verklaring eindigt indien er een verandering of toevoeging heeft plaatsgevonden welke niet met ons is afgestemd Verder geldigheid van deze...

Page 19: ...76262675 Web Site www yaleiberica com Austria Columbus McKinnon Austria GmbH Gewerbepark Wiener Straße 132a 2511 Pfaffstätten Phone 43 0 2252 46066 0 Web Site www yale at Switzerland Columbus McKinnon Switzerland AG Dällikerstraße 25 8107 BUCHS ZH Phone 41 0 448515577 Web Site www cmco ch Poland Columbus McKinnon Polska Sp z o o Ul Owsiana 14 62 064 Plewiska Phone 48 0 616566622 Web Site www pfaff...

Reviews: