Yale CPE Series Operating And Maintenance Manual Download Page 7

Yale Electric Chain Hoist CPE

electric

Yale

7

Users are to be specifically nominated by the company and

must be familiar with all relevant safety regulations.

Traversing the trolley

Plain trolleys: Pull on the load chain of the hoist.

Attention:

 Never pull on the pendant control cable.

Geared trolleys: By operating the trolley hand chain.

Electric trolleys: By operating the 

4

- resp. 

3

-button.

For trolleys with two speeds: The first stage of button

depression activates the slow speed, further depression

activates the fast speed. Use the slow speed for short

periods only.

Consider the braking distance of the trolley. Do not use the

beam end stops as operational limit devices

Attaching the load

Attach the load to the hoist using only approved and certified

slings or lashing devices. Never use the load chain as

sling chain. The load must always be seated in the saddle

of the hook. Never attach the load to the tip of the hook.

Never remove the safety latch from suspension or load

hooks.

Lifting / lowering the load

The load is lifted by depressing the 

5

-button, it is lowered

by depressing the 

6

-button. For hoists with two speeds:

The first stage of button depression activates the slow

speed, further depression activates the faster speed. Use

the slow speed for short periods only. Do not use the chain

end stop as operational limit device.

Emergency stop

All movement can be immediately halted by depressing

the red, mushroom shaped button on the pendant control.

Attention: 

Operating the red emergency button does  NOT

automatically disconnect the mains supply  to hoist or trolley

.

To release the emergency stop, rotate the button in an anti-

clockwise direction.

4. FUNCTIONAL CHECK AFTER ASSEMBLY

Prior to operating the hoist, grease the trolley pinions (manual

geared and electric trolleys) and lubricate the load chain when

it is not under load (see page 8).

Before the hoist is put into regular service, following

additional inspections must be made:
• Are all screwed connections on hoist and trolley tight

and are all locking devices in place and secure?
• Are the end stops on the trolley runway in place and

secure?
• Is the chain drive correctly reeved?
• Is the chain end stop correctly fitted to the loose end of

the load chain?
• All units equipped with two or more chain strands

should be inspected before initial operation for twisted or

kinked chains. The chains of 2-strand hoists may be twisted

if the bottom block is rolled over .
• Perform an operation cycle without load. The chain

should move in a steady , smooth way. Check the function

of the overload device by raising the bottom block against

the hoist body (max. 5 sec.).
• Check the brake function when lifting and lowering. The

braking distance must not be more than 50 mm.
• Traverse the trolley (if available) the complete length of

the trolley runway ensuring that the 2 - 4 mm lateral

clearance between the trolley wheel flange and the beam

outer edge is maintained at all times. Check that beam

end stops are positioned correctly and secure.

5. OPERATION

In addition to the recommendation in section 1, following

rules must be strictly maintained to ensure the safe

operation of the hoist:

Installation, service, operation

Users delegated to install, service or independently

operate the hoist must have had suitable training and be

competent.

 Model

P

n

   

[kW]

ED

[%]

I

a

/I

n

I

n

[A]

Fuse

(slow)

 Wire cross section in mm

2

 for cable length

[A]

0-50 m

50-100 m

100-150 m

 CPE 16

 CPE 25

 CPE 32

 CPE 50

2,3

40

4,7

5,3

16*

1,5

1,5

2,5

 CPE 20

 CPE 30

 CPE 40

2,8

25

4,7

6,4

16*

2,5

2,5

-

 Model

P

n

[kW]

ED

[%]

I

a

/I

n

I

n

[A]

Fuse

(slow)

Wire cross section in mm

for cable length

[A]

0-50 m

50-100 m

100-150 m

 CPEF 16

 CPEF 25

 CPEF 32

 CPEF 50

0,58/2,3

20/40

1,8/4,4

3,3/5,5

16*

1,5

2,5

2,5

 CPE 20

 CPE 30

 CPE 40

0,7/2,8

15/25

1,8/4,4

4,0/6,8

16*

2,5

2,5

-

all data for 400V, 3 Phase, 50 Hz

* for direct control ( for low voltage contactor control = 10A )

Summary of Contents for CPE Series

Page 1: ...Electric Chain Hoist Series CPE Mod CPE F Capacity 1600 kg 5000 kg Yale electric Yale Industrial Products GmbH P O Box 10 13 24 D 42513 Velbert Germany Am Lindenkamp 31 D 42549 Velbert Germany Tel 20...

Page 2: ...0 52 5 5 1 25 1 Am 98 180 or 180 300 1800 11 11 2 8 0 37 0 3 0 09 40 40 20 CPE 30 5 CPEF 30 5 3000 1 25 25 15 2 8 2 8 0 7 5 5 1 25 1 Bm 98 180 or 180 300 1800 11 11 2 8 0 37 0 3 0 09 40 40 20 CPE 32 4...

Page 3: ...ansport loads while personnel are in the danger zone Do not allow personnel to pass under a suspended load see Fig 2 After lifting or tensioning a load must not be left unattended for a longer period...

Page 4: ...use the chain end stop as an operational limit device see Fig 1 chain end stop Do not throw the hoist hoist or trolley down Always place it properly on the ground 2 3 Initial operation Inspection bef...

Page 5: ...ook CPE VTP G E check that the clearance between the trolley wheel flange and the beam outer edge is equal on both sides and within the tolerances given see page 6 2 3 Enlarging the clearances e g to...

Page 6: ...hand chain 3 4 Electrical connection Attention Work at electrical installations may be carried out by electrical experts only The local regulations have to be strictly observed in Germany DIN 7100 VD...

Page 7: ...en it is not under load see page 8 Before the hoist is put into regular service following additional inspections must be made Are all screwed connections on hoist and trolley tight and are all locking...

Page 8: ...ate shorter periods The Yale electric chain hoists conform to FEM group 1Am resp 1Bm in accordance with FEM 9 511 This results in a theoretical service lifetime of 800 resp 400 operating hours under f...

Page 9: ...rds the chain guide and away from the load sheave Operate the hoist in the lowering direction to feed the chain through the hoist 4 Fitting lower block and chain end stop Slide the end buffers over th...

Page 10: ...Check for cracks or wear Suspension pins Connection between hoist and suspension hook resp trolley Check for cracks or wear Ensure all safety devices are in place and secure 6 7Overload protection de...

Page 11: ...act adjustment of the overload device is only possible when the hoist is completely reassembled Pre adjustment of the cup spring 41 is made with the fixing screw 42 After the exact adjustment has been...

Page 12: ...Yale Electric Chain Hoist CPE Yale electric 12 1 2 6 4 7 8 9 11 11 15 19 20 5 7 Fig 16 Hoist body 3 10 18 22 17 14 16 13 23 29 12 14 14 14 25 26...

Page 13: ...16 2 speeds 1 0600117 0600117 0600117 0600117 0600117 0600117 0600117 13 Planetary gear 1 0609678 0609678 0608814 0608814 0609678 0609678 0608814 14 Hex screw 8 9101660 9101660 9101660 9101660 9101660...

Page 14: ...ing 1 9139020 8 Chain bolt 1 0608855 9 Buffer 1 0609734 10 14 Chain end stop assy 1 0609995 10 Chain end stop half 2 0608867 11 Cyl screw 1 9102019 12 Lockwasher 1 9122032 13 Hex nut 1 9115014 14 Buff...

Page 15: ...5 2 3 1 Fig 18 Chain Container Item Description Qty Yale Part No No all models 1 Chain container assy for 13 m linear chain length 1 6109467 1 Chain container assy for 21 m linear chain length 1 61094...

Page 16: ...tric 16 Fig 19 Gearbox Prior to assembl y soak in oil for 1 hour Fitted with Loctite 243 5900 6000 N Pre tension of cup spring Secu re with Loct ite 243 afte r com pleti on of clutc h adju stme nt 0 3...

Page 17: ...s indicate serial number and mfg year of hoist Item Description Qty Model No CPE 30 5 Planet gearbox assy 1 0600230 1 Gearbox housing 1 0600237 2 Ring 1 0600238 3 Planet gear carrier 1 0600239 4 Packi...

Page 18: ...88 0600188 7 Fan cover 1 0600189 0600189 8 Terminal box assy 1 0600190 0600190 board box box cover box seal 9 Rectifier 1 0600110 0600110 16 Armature disc 1 0600113 0600113 17 Brake fan 1 0600112 0600...

Page 19: ...tag L2 1 0609818 Name tag L3 1 0609819 Name tag PE 1 0609820 Name tag 3 0609821 Name tagF5 1 0609822 Name tag F6 1 0609823 Item Description Qty Yale Part No No all models 15 Screw fitting 3 9184082 1...

Page 20: ...sy with emergency stop 1 0609454 0609455 2 Control cable specify length 9062407 9062407 3 Wiring diagram 1 0609631 0609632 4 Clamp 2 0605355 0605355 5 Screw fitting 1 9184082 9184082 6 Screw fitting 1...

Page 21: ...609687 2 Carrier for contact element 1 0609965 0609965 3 Lowering button DN 1 0609966 0609967 Lifting button UP 1 0609968 0609969 4 Contact element emerg stop 1 0609978 0609978 5 Emergency stop button...

Page 22: ...Description Qty CPE CPEF No 1 speed 2 speed Pendant control assy with emergency stop 1 0609566 0609567 1 Contact element 1 0609980 0609981 2 Emergency stop button 1 0609984 0609984 3 Lowering button...

Page 23: ...170 5 Round nut 4 0559168 6 Washer 4 9121213 7 Hex nut 4 9115156 2 5 8 6 8 6 8 8 6 1 9 5 15 15 13 6 11 9 5 4 4 5 11 10 3 9 7 10 7 12 7 14 Fig 26 Plain Trolley 9 10 7 10 11 Item Description Qty Yale Pa...

Page 24: ...9151079 3 Snap ring 4 9129003 4 Support 1 0508229 5 Spacer tube 1 0719111 6 Lockwasher 4 9122016 7 Hex screw 2 9101050 8 Bushing 1 0102503 9 Spacer 4 9121205 Item Description Qty Yale Part No No all m...

Page 25: ...Flange 1 0719371 6 Drive shaft 1 0719372 7 Fitting key 1 9131072 8 Needle bearing 1 9153077 9 Snap ring 1 9129016 10 Hex screw 4 9101170 11 Lockwasher 4 9122003 12 Roll pin 1 9134080 Item Description...

Page 26: ...0600030 0600030 0600023 0600023 0600030 0600030 0600023 4 button UP hoist 1 0600024 0600031 0600031 0600024 0600024 0600031 0600031 0600024 5 button LEFT trolley 1 0600023 0600030 0600023 0600030 060...

Page 27: ...12 1 3 31 6 Zuleitung Cable conductor hoist Fig 30 Contactor control CPE F with VTE F 7 14 17 10 2 6 6 29 30 16 9 15 16 20 23 22 18 8 32 Item Description Qty Yale Part No No all models Name tag 3 0609...

Page 28: ...19 Fig 31 Direct control CPE F with VTE F 1 15 18 Cable conductor trolley Cable conductor hoist Zuleitung Item Description Qty Yale Part No No all models 15 Wiring diagram CPE VTE 1 0609882 Wiring di...

Page 29: ...Yale Electric Chain Hoist CPE electric Yale 29...

Page 30: ...Yale Electric Chain Hoist CPE Yale electric 30 InspectionChart Inspectionbeforeinitialoperation by Date of initial operation RegularInspections Date Findings Repair Test Date by competent person...

Page 31: ...t Serial number from manufacturing year 1 95 Serial numbers for the individual capacities models are registered in the production book with the remark CE sign Relevant EC Directives EC Machinery Direc...

Page 32: ...Yale Electric Chain Hoist CPE Yale electric 32 Quality engineered and performance tested recognisably...

Reviews: