Xylem McDonnell & Miller MM-706B Instruction Manual Download Page 2

2

3

OFF

ON

STEP 1 - Removal and Replacement of Contacts and Terminal Panels

a.

Turn power off to boiler and all controls.
Allow boiler to cool to 80˚F (27˚C) and
reduce the pressure to 0 psi (0 bar).

TOWER TUBE

SWITCH
ASSEMBLY

TERMINAL
CONNECTIONS

SWITCH
COVER

TERMINAL
PANELS

CONDUIT
CONNECTOR

NAMEPLATE

FITTING
HUB

C

A

b. Remove and Replace Switch Assembly

• Remove two screws (

A

) and lift off

switch cover.

• Identify

terminal connections

for

rewiring and then disconnect all wires
from

terminal panels.

• Remove

conduit connector

and wires

from the integral

fitting hub.

• Remove four hex nuts (

B

) and carefully

lift

switch assembly

up and off

tower tube.

• Carefully slide new

switch assembly

over

tower tube

and secure with four

hex nuts (

B

). Make sure

nameplate

is

in same position as old unit.

• Remove two screws (

A

) and lift

switch

cover

off new unit.

• Install

conduit fitting

from old unit

with attached wires on

switch assembly

.

• Reconnect wiring to

terminal panel

in

exactly the same position as removed.

• Replace

switch cover

and fasten with

two screws (

A

).

STEP 2 - Testing

a. Turn on power to boiler and pump circuits.

With the boiler empty, the pump should turn on (5 or 5-M switch models) or the valve open
(7B or 7B-M switch models). The burner should remain off and boiler should begin to fill with water.

b. For Automatic Reset Models

When water level in the gauge glass is approximately 1 3/8” (35mm) above the horizontal cast line,
the burner should turn on.

For Manual Reset Models

When water level in the gauge glass is approximately 1 3/8” (35mm) above the horizontal cast line,
press the manual reset button and the burner should turn on.

c. For 5 or 5-M Switch Models

When water level in the gauge glass is approximately 2 1/8” (54mm) above the horizontal cast line,
the pump should turn off.

For 7B or 7B-M Switch Models

When water level in the gauge glass is approximately 2 11/16” (68mm) above the horizontal cast
line, the valve should be closed.

d.

With the water in the boiler at its normal level and burner on, SLOWLY open the blow-down valve
until it is fully open. As the water level in the gauge glass begins to drop, verify that the following
occurs.

For 5 or 5-M Switch Models

When water level drops to approximately 1 1/8” (29mm) above the horizontal cast line, the pump
should turn on.
When water level drops to the horizontal cast line, the burner should turn off.

For 7B or 7B-M Switch Models

As the water level drops, the valve should begin to open.
When the water level drops to approximately 7/8” (22mm) above the horizontal cast line, the valve
should be full open.
When the water level drops to the horizontal cast line, the burner should turn off.

e.

Close the blow-down valve after burner turns off and restore water level to normal operating level.

f.

Repeat testing procedure several times to ensure proper operation of control.

g.

After testing and verification of control operation, the boiler can be returned to service.

– Dimensions shown are typical.
– The following testing procedure is only meant to serve as a verification of proper

operating sequence.

Proceed to Step 2 to Test Control

CAUTION

Immediately turn off all power if the burner turns on with no water in the gauge glass.
Investigate further before continuing procedure.

!

CAUTION

If pump does not turn off or valve close, turn off water supply to boiler. Investigate
further before continuing procedure.

!

There may be more than one source of power to
the boiler.

!

CAUTION

05592:MM-706

2/4/10

9:42 AM

Page 3

Reviews: