background image

Pump Circuit Rating (Amperes)

Voltage

Full Load

Locked Rotor

Pilot Duty

120 VAC

7.4

44.4

345 VA at

240 VAC

3.7

22.2

120 or 240 VAC

Approximate

Distance Above

Cast Line

Differential

Setting

In.   (mm)

In.   (mm)

Pump Off

1

3

/

8

(35)

3

/

4

(19)

Pump On

5

/

8

(16)

Burner On

7

/

8

(22)

7

/

8

(22)

Burner Off

0

(0)

NORMAL BOILER

WATER LINE

BURNER

CUT-OFF LEVEL 

AT CAST LINE

7/8" (22 mm)

BURNER ON
BURNER OFF

CUT-OFF 

LEVEL

NORMAL BOILER

WATER LINE

PUMP

OFF

BURNER

OFF

BURNER

CUT-OFF LEVEL 

AT CAST LINE

1 3/8" (35mm)

CUT-OFF 

LEVEL

NORMAL BOILER

WATER LINE

CUT-OFF 

LEVEL

PUMP OFF
PUMP ON

3/4" (19mm)

OPERATION

Maximum Pressure:

50 psi (3.5 kg/cm

2

)

Electrical Ratings

Settings and Differential Pressures

Values are ±

8

” (3.2mm).

Series 42S 

50 psi

(3.5 kg/

cm

2

)

Pressure

2

Motor Horsepower

Voltage

Hp

120 VAC

1/3

240 VAC

1/3

CAUTION:

A more frequent replacement interval may be necessary based on the condition of

the unit at time of inspection. McDonnell    Miller s warranty is one (1) year from date

of installation or two (2) years from the date of manufacture.

&

'

Summary of Contents for McDonnell & Miller 42S Series

Page 1: ...INSTRUCTION MANUAL MM 231G...

Page 2: ...ATER LINE PUMP OFF BURNER OFF BURNER CUT OFF LEVEL AT CAST LINE 1 3 8 35mm CUT OFF LEVEL NORMAL BOILER WATER LINE CUT OFF LEVEL PUMP OFF PUMP ON 3 4 19mm OPERATION Maximum Pressure 50 psi 3 5 kg cm2 E...

Page 3: ...Cut Off Pump Controller Must be Installed INSTALLATION TOOLS NEEDED Two 2 pipe wrenches one 1 flathead screw driver and pipe sealing compound IMPORTANT Follow the boiler manufacturer s instructions al...

Page 4: ...as depicted in the diagram to the bottom right OR If gauge glass tappings F and G are greater than 14 356 mm apart invert the black Y casting H as depicted in the diagram to the bottom right and inst...

Page 5: ...P Screw reducer bushing Q nipple R and blow off valve S into bottom 1 NPT tapping T Screw lower union tailpiece V with nut U into either 1 2 NPT lower tapping W X Screw 1 2 NPT pipe plug into unused...

Page 6: ...rient 1 2 NPT tapping FF with 1 2 tapping on control GG b Mount and pipe control HH on vertical equalizing pipes JJ at the required elevation as determined in Step 1 c Install gauge glass and other tr...

Page 7: ...h could result in property damage personal injury or death WARNING Switch Operation Boiler feed pump off burner on Boiler feed pump on burner on Boiler feed pump on burner off 1 2 5 6 1 2 5 6 1 2 5 6...

Page 8: ...n NOTE To help insure most effective operation balance boiler feed pump s to deliver required water feed rate to match boiler steaming requirements 1 Main Line Switch For burner circuits within the sw...

Page 9: ...ating ranges are shown on page 2 in the Operation section OFF ON If the burner comes on immediately turn the boiler off and make the necessary corrections Failure to follow this warning could cause an...

Page 10: ...urner is on slowly open the blow down valve NN until it is fully open Watch the gauge glass D to see that the water level drops Close the valve after verifying that the pump comes on and the burner sh...

Page 11: ...s on NOTE Refer to page 2 for switch operating points Open upper valve 1 Slowly open the lower valve 2 Water in the sight glass should lower As the water in the sight glass lowers the pump should turn...

Page 12: ...ngs and other wear parts or consumables all of which are not warranted except as otherwise provided in the quotation or sales form will be free from defects in material and workmanship for a period of...

Reviews: