![Xylem Lowara SEKAMATIK 200 E UF Installation And Operation Instruction Manual Download Page 12](http://html2.mh-extra.com/html/xylem/lowara-sekamatik-200-e-uf/lowara-sekamatik-200-e-uf_installation-and-operation-instruction-manual_4258003012.webp)
12
Clean the pump station with clear water and
scour the pump station by running pumps every
6 months.
Check the operatability and the mobility of the
niveau sensors every 6 months.
Make an arrangement with you XYLEM agent for
an annual maintenance.
Servicing Contract
For a regular expert execution of all necessary mainte-
nance and inspection we recommend the conclusion of a
servicing contract by our XYLEM Service.
9. Warranty Receipt
Warranty receipt
Disposal unit
No.
Correspond to our warranty conditions we
achieve
12 months of warranty
10. Baumaße / Dimensions (in mm)
ohne Schachtverlängerung / without extension kit
mit Schachtverlängerung / with extension kit