![Xylem Flygt 2125 Installation, Operation And Maintenance Manual Download Page 21](http://html1.mh-extra.com/html/xylem/flygt-2125/flygt-2125_installation-operation-and-maintenance-manual_4083379021.webp)
5. Make sure that any thermal contacts incorporated in the pump are properly connected
to the terminal board.
6. Install the cover.
7. Fasten the screws on the entrance flange so that the cable insertion assembly bottoms
out.
8. Tighten the clamping screws.
After you have connected the motor cable to the pump, connect the motor cable and the
control cable to the starter equipment.
WARNING:
Do not install the starter equipment in an explosive zone unless it is explosion-proof rated.
Three thermal contacts are incorporated in the stator. They are normally closed.
Thermal contacts must never be exposed to voltages higher than 250 V, breaking current
maximum 6 A at a power factor 0.6. It is recommended that the thermal contacts are
connected to 24 V over a separate fuse to protect any other automatic equipment.
Cable charts
Connection locations
WS001021B
L1 L2 L3
T3 T4
T1 T2
15
13
14
4
2
3
1
7
10
5
9
8
6
11
12
17
16
24
22
23
19
20
21
18
1
Starter equipment and main leads (L1, L2, L3)
13
Coil
2
Earth (ground)
14
Transformer
3
Functional ground
15
Capacitor
4
Control leads (T1, T2, T3, T4)
16
Softstarter
5
Phase shifter
17
Level regulator
6
Diode
18
Contactor, start relay or thermal relay
7
Motor cable, minimum 20 m (66 ft.)
19
Thermal detector in stator
Installation
Flygt 2125 Installation, Operation, and Maintenance Manual
19
Summary of Contents for Flygt 2125
Page 1: ...Flygt 2125 Installation Operation and Maintenance Manual...
Page 2: ......
Page 60: ......
Page 61: ......