Xylem Bell & Gossett e-82 Series Nstruction Manual Download Page 7

4  Maintenance

4.1  Remove the seal or packing rings

This information replaces P2004729, Series e-82 Instruction Manual Section 6.4.5.
1. Remove the hex nuts from the seal cap bolts.
2. For the 80-PF, remove the hex nuts that hold the packing gland to the stuffing box.
3. Remove the cover plate screws.
4. Remove the cover plate from the bracket.
5. Remove the seal assembly or packing rings.

4.2  Assemble the packed stuffing box

This information replaces P2004729, Series e-82 Instruction Manual Section 6.6.1.

1. Slinger

2. Shaft sleeve

3. Packing gland

4. Flush line

5. Coverplate capscrew

6. Impeller key

7. Volute capscrew

8. Impeller washer

9. Impeller

10.Impeller capscrew

11.Volute

12.Impeller lockwasher

13.Volute gasket

14.Coverplate

15.Drip drain

16.Lantern ring

17.Packing

18.Gland bolt

19.Bracket

20.Shaft

Figure 1: Packed stuffing box

1. Insert two packing rings into the stuffing box.
2. Insert the lantern ring and the last two pieces of packing.

Make sure that the joints on the packing rings are staggered 90º.

3. Install, but do not tighten, the packing gland.
4. Install the cover plate over the pump shaft.
5. Tighten the capscrews according to the Capscrew torque table in the P2004729, Series

e-82 Instruction Manual Chapter 6: Maintenance.

6. Tighten the packing gland to compress the packing.

4  Maintenance

Series e-82 Packing Seal Instructions INSTRUCTION MANUAL

5

Summary of Contents for Bell & Gossett e-82 Series

Page 1: ...INSTRUCTION MANUAL P2005039 Series e 82 Packing Seal Instructions...

Page 2: ......

Page 3: ...Product Description 3 2 1 Operation specifications 3 3 Operation 4 3 1 Note on the packed pump operation 4 4 Maintenance 5 4 1 Remove the seal or packing rings 5 4 2 Assemble the packed stuffing box...

Page 4: ...al injury and damage to property and may void the warranty NOTICE Save this manual for future reference and keep it readily available at the location of the unit 1 2 Safety WARNING The operator must b...

Page 5: ...e amount of makeup water as well as systems that are subject to a wide variety of chemical conditions and solids buildups Parameter Packing Operating temperature range F C 0 to 200 18 to 93 pH range l...

Page 6: ...on The required leakage is influenced by operating pressure fluid temperature shaft speed and so forth For fluid temperatures in the range of 32 F to 190 F 0 C to 88 C average leakage rates of 60 to 8...

Page 7: ...Impeller key 7 Volute capscrew 8 Impeller washer 9 Impeller 10 Impeller capscrew 11 Volute 12 Impeller lockwasher 13 Volute gasket 14 Coverplate 15 Drip drain 16 Lantern ring 17 Packing 18 Gland bolt...

Page 8: ...See the note on the packed pump operation in the Operation chapter for more information 4 Maintenance 6 Series e 82 Packing Seal Instructions INSTRUCTION MANUAL...

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ...ed analytics solutions for water electric and gas utilities In more than 150 countries we have strong long standing relationships with customers who know us for our powerful combination of leading pro...

Reviews: