9.
INSTALLATION
A.
Cut out a hole in the ceiling where the ducting
will go.
B.
Prepare support framework for ceiling
bracket.
C.
Place chimney bracket against ceiling & screw
it into place.
D.
Drop the ducting and electrical work through
the ceiling.
STEP #3: INSTALLING “SUPPORT BRACKET”
STEP #4: ATTACHING HOOD BODY
IMPORTANT
Before
moving to STEP5,
do the following:
1.
Make sure the
damper is able to
open FULLY
when the hood is
on.
2.
Test run to see if
there is any air
leaks / abnormal
noise.
HINT:
Due to the heavy weight of this range hood,
use of a
vertical jack to lift and support the hood in place is place is highly recommend.
STEP #5: INSTALLING CHIMNEYS
- DO NOT REMOVE CHIMNEY PROTECTIVE FILM UNTIL FINISHED INSTALLATION
A.
Loosen all 4 attached bolts.
B.
Attach the glass canopy to the hood body
C.
Use Philip screw driver to slightly tight
all 4 bolts.
.
STEP #1: MARKING “CEILING BRACKET”
A.
Put a thick, protective covering over counter top, cook top or
Range to protect from damage or debris.
B.
Find and mark the center point directly above your cook top.
C.
Place the ceiling bracket on the ceiling around the center point.
Make sure it is square with your cook top).
D.
Trace the outline of the ceiling bracket onto the ceiling.
E.
Trace a circle where the ducting will go.
F.
Mark the 4 pre-holes where you will insert the screws.
STEP #2: INSTALLING “CEILING BRACKET”
Attach lower chimney bracket (P3)
vertically to the`inside of the 4
multi-hole brackets (P2) installed in
the previous step. Make sure to
adjust to its “TOTAL BRACKET
LENGH”. Prefer to dimension table
page 4.
CAREFULLY
REMOVE
CHIMNEY
PROTECTIVE
FILM.
Page 5