TR800 Treadmill
9
Cables
3
1. Install the Handrail Support (
3
) between the Uprights (
L, R
)(
5,4
) with the
four Button Head Socket Bolts (
102
) by using the Combination M5 Allen
Wrench & Phillips Head Screw Driver (
111
).
2. Install the Beverage Holder (
48
) onto the Handrail Support (
3
).
3. Connect the Speed Adjustment Switch W/Cable (
38
) into the Incline
Cable (
Upper
) (
34
) and Handpulse Wire (
50~1
)
4. Connect the Incline Adjustment Switch W/Cable (
39
) into the Incline
Cable (
Upper
) (
35
) and Handpulse Wire(
50~1
).
102
3
111
102
4
5
102
48
38
34
39
35
50-1
39
38
50-1
Hardware Step 3
#102
. 5/16” x 15mm
Button Head Socket
Bolt (4 pcs)