Industrial PDA
59
interface. As follows:
Cable tracing interface
Click
“
Open
”
to start cable tracing, tester start sending
video signal, and then click "Close" to stop the video signal
sending, and user can exit cable tracing by pressing return.
Turn on the receiver, connect the RJ11 test line to the
cable needed to be test, and the click "Open" icon button,
the receiver will start inspection. Keeping the video signal,
and then you can find the route of the wiring.
Network Layer Test
Network layer test which including Ping test, Ifconfig
test, Route test and Traceroute test. Sliding screen can
Summary of Contents for XL-DM307G
Page 1: ...XL DM307G User manual...
Page 16: ...Industrial PDA 10 5 Structures and Functions...
Page 45: ...Industrial PDA 39 Long press a window will pop up as bellow...
Page 67: ...Industrial PDA 61 Click Yes to see current network information Route Test...
Page 68: ...Industrial PDA 62 Click Yes to check the current web information Traceroute Test...
Page 78: ...Industrial PDA 72 Click shortcut key F1 or F2 the program selected window is as follows...