![XPOtool 62966 Operating Instructions Download Page 3](http://html2.mh-extra.com/html/xpotool/62966/62966_operating-instructions_4677126003.webp)
https://www.XPOtool.com
Item 62966
Page 3
The Tool Experts
10 2023-1
Introduction
Thank you for choosing to purchase this quality product. To minimise the risk of injury, we ask you to
always take some basic safety precautions when using this product. Please read this operating manual
carefully and make sure that you understand it.
Keep these operation instructions in a safe place.
The dust protection wall is flexible, as it can be mounted and installed according to the surface of the
floor, requirements, or type of work to be done. After finishing the work, the user can simply unmount
the dust protection wall and pack it for future use.
Installation
The dust protection wall is installed in a few minutes without the use of adhesive tape or screws; it will
not leave any marks on the floor or ceiling.
Step
1
Fix the plastic sheet to the upper cushion of the
aluminium bars with the help of the end clamps.
Step
2
Lift the first aluminium bar, the spring part point-
ing to the ceiling, then the other bars one after
another.
Step
3
Unlock the bar by turning the upper part anticlock-
wise. Now, adjust the length up or down and lock
the bar.
Step
4
With the help of the U clips, fix the sheet to the
bars.