![XLT Ovens XLT TS Series Manual Download Page 18](http://html.mh-extra.com/html/xlt-ovens/xlt-ts-series/xlt-ts-series_manual_887776018.webp)
XD9010-TS Rev D 7/2008
Installation & Operation Manual
17
5. INSTALLATION
5.1. INSTALLATION OVERVIEW
The following is an overview of the installation process.
1.
Read this manual thoroughly.
2.
Make sure all electric, gas, and ventilation utilities are adequately sized and in place
before the oven arrives.
3.
Inspect the oven and crates for freight damage upon arrival. Assemble the oven on its
base near the area of intended usage. Remove all combustibles and obstructions from
the area.
4.
Have your plumber make all gas connections per local building codes. Provide
adequate clearance to access the gas shut off valve. Check for leaks!
5.
Have your electrician make all electrical connections per local codes. Provide
adequate clearance to access the electrical plug and receptacle.
6.
Install a restraint device and make sure that it guards against transmission of strain to
the gas line and electric cord.
7.
Test the exhaust hood using a smoke candle to determine the amount of combustion
products removed.
5.2. PURCHASER’S RESPONSIBILITY
Note: All installations must conform to local building and mechanical codes.
It is the responsibility of the purchaser:
1.
To see that the gas and electric utilities are installed on site in accordance with local
mechanical codes and with the specification in this manual.
2.
To unload, uncrate, move, and assemble the oven(s) in their intended location.
3.
To see that the gas and electric utilities are connected properly and using the proper
hardware by a qualified installer.
5.3. ASSEMBLY INSTRUCTIONS
These ovens come completely assembled from the factory except for the Back Wall
Stand-offs and Product Stops. Back wall stand-offs are attached to the conveyor belt for
shipping purposes only. They must be removed prior to oven start-up. The stand-offs
are designed to provide adequate clearance between the back of the oven and a wall. To
assemble the stand-offs, loosen the appropriate bolts in the back wall and insert the
stand-off tab underneath the flat washers of the back wall bolts. Tighten the bolts. The
product stops are shipped loose inside the oven. Remove them prior to start and install
on the exit end of the conveyor. Detailed assembly instructions are available, contact
XLT Customer Service.