background image

XK052002 – Tube Strobe Light Kit with Switch Panel                                                                             

 

 

Mounting Instructions 

1.  Test all components before mounting: 

As shown below, plug ALL light units together and connect them to the controllers 

and the switch box. Connect the RED wire to the POSITIVE pole of 12V DC battery. Connect the BLACK wire to the 
NEGATIVE pole. Turn on the switch and push the controller buttons to test the tubes.  

Adjusting tube Count 

By default, the Switch Box is set to control 4 tubes on each zone. If you are connecting more, you must synchronize the Switch 
Box following the steps below. The Switch Box has the ability to adjust the strobe patterns to best suit the amount of tubes 
utilized on any given vehicle. 

To adjust the tube count

, hold the SOLID and STROBE buttons down at the same time for 3 

seconds until the first tube on each output zone lights up solid. The red LED indicators above the SOLID and STROBE buttons 
will also breath during synchronization. Press the RIGHT CHASE button to increase the tube count or the LEFT CHASE button 
to decrease the tube count. Once all of the tubes are illuminated solid, press and hold the SOLID and STROBE buttons again 
until the tubes flash 3 times. This means that synchronization is complete and the kit is ready for install.

 

 

Tube Orientation 

The strobe system features directional chasing functions controlled via the included Switch Panel. These functions include a Right 
Chase  mode,  Left  Chase  mode,  Center  Chase  mode,  and  optional  left  or  right  turn  signals.  In  order  for  these  functions  to  work 
properly, the tubes must be wired in the correct orientation. Each output zone from the Switch Panel must begin on the driver side of 
the vehicle. If not, the chasing patterns will be opposite of what is reflected on the Switch Panel buttons. See diagram below. 

 

Reviews: