VCU1287 IBERT Getting Started Guide
8
UG1203 (v2016.4) December 15. 2016
Chapter 1:
VCU1287 IBERT Getting Started Guide
Running the GTH IBERT Demonstration
The GTH IBERT demonstration operates one GTH Quad at a time. This section describes how
to test GTH Quad 224. The remaining GTH Quads can be tested following a similar series of
steps.
Connecting the GTH Transceivers and Reference Clocks
shows the locations for GTH and GTY transceiver Quads on the VCU1287 board.
is for reference only and might not reflect the current revision of the board.
Note:
Quads 133, 232, and 233 are not available on the XCVU095 device.
X-Ref Target - Figure 1-1
Figure 1-1:
VCU1287 GTH and GTY Quad Locations
X15535-121416