February, 2008
2-561
WorkCentre 5225, 5230
078-500 , 078-900
Status Indicator Raps
Launch Version
078-500 Write to HCF-ROM error detection (During DLD
method) RAP
An error has occurred during the process of writing data to the HCF-ROM. (During DLD method)
Procedure
Retry job. If retry failed, replace the HCF-ROM and perform VerUP operation on the DLD method
again.
078-900 HCF Feed Out Sensor Static Jam RAP
BSD-ON: 8.9
The tray 6 Feed Out Sensor static jam.
Initial Actions
•
Clear any jam and switch the power off then on.
•
Check for out-of-spec paper.
•
Paper Path for a foreign object/burr/piece of paper
Procedure
Execute
Component Control
[078-101 Tray 6 Feed Out Sensor]. Move the actuator of the Tray
6 Feed Out Sensor. The display changes.
Y
N
Go to 8.8 BSD and check the following for an open wire, short or poor contact:
•
Tray 6 Feed Out Sensor
PF67
-2 to HCF PWB
PF01
-2
•
Tray 6 Feed Out Sensor
PF67
-1 to HCF PWB
PF01
-3
•
Tray 6 Feed Out Sensor
PF67
-3 to HCF PWB
PF01
-1
If OK, replace the Tray 6 Feed Out Sensor (
PL 18.7
) then the HCF PWB (
PL 18.8
).
Execute
Component Control
[078-007 Tray 6 Takeaway Motor: 640mm/s]. There is opera-
tion noise from the Tray 6 Takeaway Motor.
Y
N
Check the wire-wound resistance of Pre Reg. Motor is approx. 0.8 ohms at the measurement
points below.
•
JF57
-3 to pins 1/2
•
JF57
-4 to pins 5/6
If OK, go to 7.14 BSD and troubleshoot the Tray 6 Takeaway Motor circuit.
Execute
Component Control
[089-002 REgistration Clutch. Registration Clutch operates
Y
N
Go to 8.7 BSD and check the Registration Clutch for an open.
Check the following:
•
Drive gears for wear/breakage
•
HCF and IOT for a poor docking
•
HCF Transport Belt for poor tension
•
HCF Transport Roll for dirt/paper particles/wear/a poor rotation
•
HCF Takeaway Rolls 1-3 for dirt/ paper particles/wear/a poor rotation
•
HCF Exit Roll for dirt/ paper particles/wear/a poor rotation
•
If the results of the above checks are OK, replace HCF PWB (PL1.8).
Summary of Contents for WorkCentre 5222
Page 1: ...Tabloid Black and white Multifunction Printer WorkCentre 5225 5230 5222 Service Manual ...
Page 9: ...February 2008 viii WorkCentre 5225 5230 Launch Version Introduction Translated Warnings ...
Page 17: ...February 2008 1 2 WorkCentre 5225 5230 Launch Version Service Call Procedures ...
Page 37: ...February 2008 2 14 WorkCentre 5225 5230 Launch Version Status Indicator Raps ...
Page 39: ...February 2008 2 16 WorkCentre 5225 5230 002 500 002 770 Launch Version Status Indicator Raps ...
Page 77: ...February 2008 2 54 WorkCentre 5225 5230 003 982 Launch Version Status Indicator Raps ...
Page 121: ...February 2008 2 98 WorkCentre 5225 5230 010 421 Launch Version Status Indicator Raps ...
Page 391: ...February 2008 2 368 WorkCentre 5225 5230 024 985 024 989 Launch Version Status Indicator Raps ...
Page 401: ...February 2008 2 378 WorkCentre 5225 5230 026 700 026 702 Launch Version Status Indicator Raps ...
Page 451: ...February 2008 2 428 WorkCentre 5225 5230 027 797 Launch Version Status Indicator Raps ...
Page 489: ...February 2008 2 466 WorkCentre 5225 5230 034 798 034 799 Launch Version Status Indicator Raps ...
Page 525: ...February 2008 2 502 WorkCentre 5225 5230 042 323 042 325 Launch Version Status Indicator Raps ...
Page 531: ...February 2008 2 508 WorkCentre 5225 5230 047 217 Launch Version Status Indicator Raps ...
Page 543: ...February 2008 2 520 WorkCentre 5225 5230 062 790 Launch Version Status Indicator Raps ...
Page 547: ...February 2008 2 524 WorkCentre 5225 5230 071 211 071 940 Launch Version Status Indicator Raps ...
Page 557: ...February 2008 2 534 WorkCentre 5225 5230 073 211 071 940 Launch Version Status Indicator Raps ...
Page 565: ...February 2008 2 542 WorkCentre 5225 5230 075 135 Launch Version Status Indicator Raps ...
Page 589: ...February 2008 2 566 WorkCentre 5225 5230 081 799 Launch Version Status Indicator Raps ...
Page 595: ...February 2008 2 572 WorkCentre 5225 5230 091 916 Launch Version Status Indicator Raps ...
Page 597: ...February 2008 2 574 WorkCentre 5225 5230 092 661 092 662 Launch Version Status Indicator Raps ...
Page 601: ...February 2008 2 578 WorkCentre 5225 5230 093 925 093 926 Launch Version Status Indicator Raps ...
Page 603: ...February 2008 2 580 WorkCentre 5225 5230 094 417 094 420 Launch Version Status Indicator Raps ...
Page 607: ...February 2008 2 584 WorkCentre 5225 5230 112 700 Launch Version Status Indicator Raps ...
Page 661: ...February 2008 2 638 WorkCentre 5225 5230 121 314 Launch Version Status Indicator Raps ...
Page 689: ...February 2008 2 666 WorkCentre 5225 5230 123 399 123 400 Launch Version Status Indicator Raps ...
Page 717: ...February 2008 2 694 WorkCentre 5225 5230 124 709 124 710 Launch Version Status Indicator Raps ...
Page 719: ...February 2008 2 696 WorkCentre 5225 5230 125 311 Launch Version Status Indicator Raps ...
Page 723: ...February 2008 2 700 WorkCentre 5225 5230 127 398 127 399 Launch Version Status Indicator Raps ...
Page 735: ...February 2008 2 712 WorkCentre 5225 5230 133 700 133 710 Launch Version Status Indicator Raps ...
Page 737: ...February 2008 2 714 WorkCentre 5225 5230 134 210 134 211 Launch Version Status Indicator Raps ...
Page 739: ...February 2008 2 716 WorkCentre 5225 5230 202 399 Launch Version Status Indicator Raps ...
Page 745: ...February 2008 3 2 WorkCentre 5225 5230 Launch Version Image Quality ...
Page 783: ...February 2008 4 6 WorkCentre 5225 5230 REP 1 1 1 Launch Version Repairs and Adjustments ...
Page 795: ...February 2008 4 18 WorkCentre 5225 5230 REP 2 6 2 Launch Version Repairs and Adjustments ...
Page 805: ...February 2008 4 28 WorkCentre 5225 5230 REP 4 2 1 Launch Version Repairs and Adjustments ...
Page 807: ...February 2008 4 30 WorkCentre 5225 5230 REP 5 1 1 Launch Version Repairs and Adjustments ...
Page 809: ...February 2008 4 32 WorkCentre 5225 5230 REP 6 1 1 Launch Version Repairs and Adjustments ...
Page 857: ...February 2008 4 80 WorkCentre 5225 5230 REP 11 6 2 Launch Version Repairs and Adjustments ...
Page 907: ...February 2008 4 130 WorkCentre 5225 5230 REP 15 8 1 Launch Version Repairs and Adjustments ...
Page 949: ...February 2008 4 172 WorkCentre 5225 5230 REP 16 3 9 Launch Version Repairs and Adjustments ...
Page 1005: ...February 2008 4 228 WorkCentre 5225 5230 ADJ 9 3 1 Launch Version Repairs and Adjustments ...
Page 1129: ...February 2008 5 110 WorkCentre 5225 5230 Common Hardware Launch Version Parts List ...
Page 1130: ...February 2008 5 111 WorkCentre 5225 5230 Common Hardware Parts List Launch Version ...
Page 1131: ...February 2008 5 112 WorkCentre 5225 5230 Common Hardware Launch Version Parts List ...
Page 1132: ...February 2008 5 113 WorkCentre 5225 5230 Common Hardware Parts List Launch Version ...
Page 1133: ...February 2008 5 114 WorkCentre 5225 5230 Common Hardware Launch Version Parts List ...
Page 1134: ...February 2008 5 115 WorkCentre 5225 5230 Common Hardware Parts List Launch Version ...
Page 1135: ...February 2008 5 116 WorkCentre 5225 5230 Common Hardware Launch Version Parts List ...
Page 1136: ...February 2008 5 117 WorkCentre 5225 5230 Common Hardware Parts List Launch Version ...
Page 1137: ...February 2008 5 118 WorkCentre 5225 5230 Common Hardware Launch Version Parts List ...
Page 1139: ...February 2008 5 120 WorkCentre 5225 5230 Launch Version Parts List ...
Page 1141: ...February 2008 6 2 WorkCentre 5225 5230 Launch Version General Procedures ...
Page 1301: ...February 2008 7 2 WorkCentre 5225 5230 Launch Version Wiring Data ...
Page 1305: ...February 2008 7 6 WorkCentre 5225 5230 7 1 2 Launch Version Wiring Data ...