08/2012
4-98
WorkCentre 5021/5019
ADJ 56.1.1, ADJ 56.1.2
Initial Issue
Repairs and Adjustments
Figure 4 j0ku42043
3.
Reinstall the DADF Rear Cover.
4.
After adjustment, perform DADF Side Regi (
ADJ 56.1.2
) and DADF Lead Edge Regi.
(
ADJ 56.1.3
).
ADJ 56.1.2 DADF Side Registration
Purpose
To adjust the original to the proper position (drum shaft direction) on the Platen.
NOTE: The following adjustments must be made before carrying out checking and adjustment.
•
IOT Lead Edge/Side Edge Registration (
ADJ 18.1.1
)
•
IIT Side Registration (
ADJ 1.3.2
)
•
DADF Lead-Skew Adjustment (
ADJ 56.1.1
)
NOTE: DADF Side Registration is adjusted using the NVM for every paper width.
Check
1.
Place the Test Chart (499T 00283) such that there is no gap between the chart and the
DADF Guide.
2.
Make a copy using the following settings in Copy mode. Take this copy as the original.
•
1 to 1 Sided mode
•
Paper Tray: 'A3'
•
Reduce/Enlarge: '100%'
•
No. of Copies: '2'
3.
Mark the output copies as '1' and '2' in the order of their output.
4.
Make a Single Fold on the second copy. Check the fold line with the reference line on the
Test Chart. (Figure 1)
Figure 1 j0ku42048
5.
Check that the fold line is within 2.0mm from the reference line.
If the value is not specified, carry out the following adjustment procedure.
6.
Place the Test Chart (499T 00283) on the DADF facing down with the Test Chart fed from
the lead edge.
7.
Make a copy using the following settings in Copy mode.
•
2 to 1 Sided mode
•
Paper Tray: 'A3'
Summary of Contents for WorkCentre 5019
Page 17: ...08 2012 2 6 WorkCentre 5021 5019 2 1 3 Initial Issue Status Indicator RAPs ...
Page 19: ...08 2012 2 8 WorkCentre 5021 5019 2 2 1 1 Initial Issue Status Indicator RAPs ...
Page 21: ...08 2012 2 10 WorkCentre 5021 5019 003 500 795 003 951 Initial Issue Status Indicator RAPs ...
Page 23: ...08 2012 2 12 WorkCentre 5021 5019 004 345 Initial Issue Status Indicator RAPs ...
Page 33: ...08 2012 2 22 WorkCentre 5021 5019 023 600 Initial Issue Status Indicator RAPs ...
Page 37: ...08 2012 2 26 WorkCentre 5021 5019 041 210 211 Initial Issue Status Indicator RAPs ...
Page 39: ...08 2012 2 28 WorkCentre 5021 5019 042 325 614 Initial Issue Status Indicator RAPs ...
Page 41: ...08 2012 2 30 WorkCentre 5021 5019 045 310 045 313 Initial Issue Status Indicator RAPs ...
Page 43: ...08 2012 2 32 WorkCentre 5021 5019 061 321 061 325 Initial Issue Status Indicator RAPs ...
Page 47: ...08 2012 2 36 WorkCentre 5021 5019 071 105 Initial Issue Status Indicator RAPs ...
Page 51: ...08 2012 2 40 WorkCentre 5021 5019 075 135 Initial Issue Status Indicator RAPs ...
Page 57: ...08 2012 2 46 WorkCentre 5021 5019 092 660 668 092 910 Initial Issue Status Indicator RAPs ...
Page 59: ...08 2012 2 48 WorkCentre 5021 5019 093 312 093 912 Initial Issue Status Indicator RAPs ...
Page 61: ...08 2012 2 50 WorkCentre 5021 5019 095 910 Initial Issue Status Indicator RAPs ...
Page 63: ...08 2012 2 52 WorkCentre 5021 5019 116 321 116 377 Initial Issue Status Indicator RAPs ...
Page 65: ...08 2012 2 54 WorkCentre 5021 5019 117 326 Initial Issue Status Indicator RAPs ...
Page 67: ...08 2012 2 56 WorkCentre 5021 5019 123 314 Initial Issue Status Indicator RAPs ...
Page 75: ...08 2012 2 64 WorkCentre 5021 5019 2 2 4 8 Initial Issue Status Indicator RAPs ...
Page 89: ...08 2012 3 14 WorkCentre 5021 5019 IQ15 Initial Issue Image Quality ...
Page 106: ...08 2012 4 4 WorkCentre 5021 5019 4 1 Initial Issue Disassembly Assembly and Adjustment ...
Page 116: ...08 2012 4 14 WorkCentre 5021 5019 REP 1 6 1 Initial Issue Repairs and Adjustments ...
Page 118: ...08 2012 4 16 WorkCentre 5021 5019 REP 2 1 1 Initial Issue Repairs and Adjustments ...
Page 122: ...08 2012 4 20 WorkCentre 5021 5019 REP 4 1 1 Initial Issue Repairs and Adjustments ...
Page 124: ...08 2012 4 22 WorkCentre 5021 5019 REP 6 1 1 Initial Issue Repairs and Adjustments ...
Page 126: ...08 2012 4 24 WorkCentre 5021 5019 REP 7 1 1 Initial Issue Repairs and Adjustments ...
Page 130: ...08 2012 4 28 WorkCentre 5021 5019 REP 8 2 1 REP 8 2 2 Initial Issue Repairs and Adjustments ...
Page 162: ...08 2012 4 60 WorkCentre 5021 5019 REP 19 2 1 Initial Issue Repairs and Adjustments ...
Page 190: ...08 2012 4 88 WorkCentre 5021 5019 ADJ 1 3 2 Initial Issue Repairs and Adjustments ...
Page 192: ...08 2012 4 90 WorkCentre 5021 5019 ADJ 8 1 1 Initial Issue Repairs and Adjustments ...
Page 198: ...08 2012 4 96 WorkCentre 5021 5019 ADJ 18 2 2 Initial Issue Repairs and Adjustments ...
Page 209: ...08 2012 5 6 WorkCentre 5021 5019 5 1 4 5 1 5 Initial Issue Parts List ...
Page 267: ...08 2012 5 64 WorkCentre 5021 5019 99 8 Initial Issue Parts List ...
Page 293: ...08 2012 6 24 WorkCentre 5021 5019 6 1 28 6 1 29 Initial Issue General Procedures ...
Page 295: ...08 2012 6 26 WorkCentre 5021 5019 6 2 1 6 2 2 Initial Issue General Procedures ...
Page 299: ...08 2012 6 30 WorkCentre 5021 5019 6 3 1 3 Initial Issue General Procedures ...
Page 303: ...08 2012 6 34 WorkCentre 5021 5019 6 3 2 3 Initial Issue General Procedures ...
Page 305: ...08 2012 6 36 WorkCentre 5021 5019 6 3 3 Initial Issue General Procedures ...
Page 317: ...08 2012 6 48 WorkCentre 5021 5019 6 3 6 Initial Issue General Procedures ...
Page 319: ...08 2012 6 50 WorkCentre 5021 5019 6 3 7 Initial Issue General Procedures ...
Page 325: ...08 2012 6 56 WorkCentre 5021 5019 6 3 10 Initial Issue General Procedures ...
Page 327: ...08 2012 6 58 WorkCentre 5021 5019 6 3 11 Initial Issue General Procedures ...
Page 331: ...08 2012 6 62 WorkCentre 5021 5019 6 3 13 Initial Issue General Procedures ...
Page 335: ...08 2012 6 66 WorkCentre 5021 5019 6 3 14 Initial Issue General Procedures ...
Page 337: ...08 2012 6 68 WorkCentre 5021 5019 6 3 15 Initial Issue General Procedures ...
Page 347: ...08 2012 6 78 WorkCentre 5021 5019 6 3 17 Initial Issue General Procedures ...
Page 353: ...08 2012 6 84 WorkCentre 5021 5019 6 3 19 Initial Issue General Procedures ...
Page 355: ...08 2012 6 86 WorkCentre 5021 5019 6 3 20 Initial Issue General Procedures ...
Page 358: ...08 2012 6 89 WorkCentre 5021 5019 6 4 1 3 General Procedures Initial Issue ...
Page 359: ...08 2012 6 90 WorkCentre 5021 5019 6 4 1 3 Initial Issue General Procedures ...
Page 377: ...08 2012 6 108 WorkCentre 5021 5019 6 4 3 Initial Issue General Procedures ...
Page 393: ...08 2012 7 10 WorkCentre 5021 5019 7 1 2 Initial Issue Wiring Data ...
Page 415: ...08 2012 7 32 WorkCentre 5021 5019 4 5 Initial Issue Wiring Data ...
Page 423: ...08 2012 7 40 WorkCentre 5021 5019 CH2 1 Initial Issue Wiring Data ...
Page 427: ...08 2012 7 44 WorkCentre 5021 5019 CH3 3 Initial Issue Wiring Data ...
Page 429: ...08 2012 7 46 WorkCentre 5021 5019 CH4 1 Initial Issue Wiring Data ...
Page 437: ...08 2012 7 54 WorkCentre 5021 5019 CH5 7 Initial Issue Wiring Data ...