Xerox D110/D125 Copier/Printer
セキュリティターゲット
- 89 –
Copyright
2012 by Fuji Xerox Co., Ltd
FPT_STM.1.1
The TSF shall be able to provide reliable time stamps.
FPT_TST.1 TSF
testing
Hierarchical to:
No other components.
Dependencies: No
dependencies.
FPT_TST.1.1
The TSF shall run a suite of self tests [selection: during initial
start-up, periodically during normal operation, at the request
of the authorised user, at the conditions [assignment:
conditions under which self test should occur]] to demonstrate
the correct operation of [selection: [assignment: parts of TSF],
the TSF].
[selection: during initial start-up, periodically during normal
operation, at the request of the authorised user, at the
conditions [assignment: conditions under which self test
should occur]]
- at the conditions [assignment: conditions under which self
test should occur]
[assignment: conditions under which self test should occur]
- at initiation under which self test is set
[selection: [assignment: parts of TSF], the TSF].
- [assignment: parts of TSF]
- TSF executable code
FPT_TST.1.2
The TSF shall provide authorised users with the capability to
verify the integrity of [selection: [assignment: parts of TSF
data], TSF data].
[selection: [assignment: parts of TSF data], TSF data]
- [assignment: parts of TSF data]
- TSF data in NVRAM/SEEPROM (excluding audit log data, and
date and time data)
FPT_TST.1.3
The TSF shall provide authorised users with the capability to
verify the integrity of [selection: [assignment: parts of TSF],
TSF].
[selection: [assignment: parts of TSF]
- [assignment: parts of TSF]
- TSF executable code in program ROM