![XCMG XZ320 Operation Instructions Manual Download Page 22](http://html.mh-extra.com/html/xcmg/xz320/xz320_operation-instructions-manual_882150022.webp)
XZ320 Horizontal Directional Drill Usage Manual
19
9.2 Detail precaution measures of various kinds of construction sites
9.2.1 Detail precaution measures of power site
Take one or all methods as follows:
9.2.1.1 Electric wires shall be exposed by manual excavation.
9.2.1.2 Power failure during construction: Power department shall inspect
power wires before restoring power supply.
9.2.2 precaution measures of natural gas site
9.2.2.1 Drill shall be installed toward upwind direction of natural gas pipes.
9.2.2.2 Electric wires shall be exposed by manual excavation and bore
track shall be traced by probe carefully.
9.2.2.3 Gas supply cutoff during construction: Fuel gas department shall
inspect pipes before restoring gas supply.
9.2.3 Other site protection measures
Different methods may be used to prevent us from other underground
dangerous articles. Please contact responsible person of dangerous articles
to define protection measures.
9.3 Safety warning classification
Such illustrations are used to prompt danger to you, surrounding persons
and equipment. Please read such warnings or illustrations carefully with
strict execution.
Do not touch it before cooling.
Keep far away from it due to possible severe
winding and injury.
top-stm.ru
Summary of Contents for XZ320
Page 1: ...t o p s t m r u ...