Soil Installation Instructions (At Job Site)
1. Set posts (dig hole 18” deep)
2. Attach brackets on one side of the post with included tek screws
Measure 5-3/8” from the top of the post and attach Bracket
Measure 1-7/8” from first Bracket to set the second Bracket
Measure 2” from the bottom of the ground to set the bottom Bracket
3. Insert top rail into the bracket. Slide bracket onto opposite side of the rail
(Repeat steps for middle and bottom rails)
4. Secure brackets with tek screws
5. Insert pickets through the rails, and make sure pickets are secured into rails
6. Installation is now complete
1.Dig hole 18” deep and fill hole
with concrete and wait for
concrete mix to set
2.Attach brackets to one side of
the post
3.Insert top rail to already installed
bracket, slide bracket onto rail for
bracket installation on opposite
side. Repeat for middle and bottom
rails
4.Secure Rails to Bracket with tek
screws provided.
5.Slide pickets into rail holes
starting from left to right
6.Fence panel installation is
complete