Start-up and Testing
975-0059-01-01 Rev A
3–3
Figure 3-1
Testpoints for Confirming Voltages
L1
L2
NEUTRAL
GROUND
LEGEND
GROUND
NEUTRAL
HOT L1
HOT L2
To 240 Vac
Loads
AC Distribution Panel
(Sub-panel)
120/240 Vac
To 120 Vac
Loads
To Main Utility
Panel Ground
To L2 Inverter
To L2 Inverter
To L1 Inverter
6
5
4
Summary of Contents for power Inverter Stacking
Page 2: ......
Page 3: ...Inverter Stacking Control Series ISC S Cable Installation Guide...
Page 8: ...vi...
Page 10: ...viii...
Page 12: ...x...
Page 36: ...2 18...
Page 42: ...3 6...
Page 48: ...IX 2...
Page 49: ......