Bolt the Upright Beams into each Base making sure the J-Cup holes are
facing out as shown below.
STEP TWO
X Training Equipment • [email protected] • (877) 348-7464
1
2
3 4
8x
110mm M12 Bolt
16x
M12 Washer
8x
M12 Nuts
J-Cup holes facing out
2x
Upright Beam