![X Training Equipment COMPETITION PULL-UP RIG Assembly Manual Download Page 11](http://html1.mh-extra.com/html/x-training-equipment/competition-pull-up-rig/competition-pull-up-rig_assembly-manual_3071643011.webp)
One assembly at a time, tilt it up and place it flush against the previously
mounted assembly to mark the bolt locations. Tilt it back down to mount
your stringers(if applicable). Then tilt the assmebly back up and secure it
to the rig and wall.
STEP SIX
X Training Equipment • [email protected] • (877) 348-7464
1 2 3 4
5
5
6
7
Repeat this step for each
Squat Station. Refer to ‘Assemblies’
page for reference.