background image

WC-R4500-60-DBL

INSTALLATION-GUIDE

INSTALLATION INSTRUCTIONS

1

2

Attach the bracket by screwing into a wall stud for

reinforcement.

3

Mark the position of the screw holes on the wall by

measuring the space between the centers of the mounting

brackets on the back of the vanity. Vertical position (X) is 

decided by the purchaser. Remember to mark low enough 

to accommodate the sink on the top of the top of the vanity 

counter or it will be too high when installed. Use a spirit level 

to ensure the screw holes are horizontal. 

4

 Attach vanity to wall by lowering onto the mounting

brackets.

5

Adjust the mounting attachment as required.  

Draw horizontal line

Mark screw position

Upper screw adjusts

vertical position

Lower screw

adjusts depth

Silicone

Attach counter to cabinet with silicone sealant applied

to top of front and side cabinet edges. Do not over apply.

Allow to dry for 24 hours for proper curing.

Diameter  15/64 in.

Depth  1.57 in.

Reviews: