background image

WC-2020-WC

INSTALLATION GUIDE

 

X

Diameter 5/16 in.

Depth 1-1/2 in.
Drill holes

(top and bottom)

Draw horizontal line

(1)

(2)

Electric drill

Drill bit 

Tape measure

Pencil

Screwdriver

Hammer

Stud Bolt

 4-pieces 

Screws

4-pieces 

Washer

4-pieces 

Screw cover

4-pieces 

Measure positions on wall to reflect 

predrilled holes located inside of 

cabinet (top and bottom)

After holes are drilled, hammer in 

the stud bolts into the holes. Then 

line up cabinet to match the predrilled 

holes on back of cabinet.

Put screws into the washer through 

the cabinet holes and tighten with 

screwdriver till cabinet is secure to 

the wall.

Reviews: