
Würth LR 5-14
21
Applications
en
4.
Turn on the RL 5-14 and the receiver.
5.
Set the base of the rod on a known point for the finished grade.
6.
Adjust the height of the receiver on the rod until the on-grade (centre-line) position is indicated on the
receiver by:
• the centre bar
• the green flashing LED
• a solid audio tone
7.
Set the rod with the attached receiver on top of the excavation or concrete pour to check for correct
elevation.
8.
Variances can be read from the digital receiver.
• 7a: Position is too high.
• 7b: Position is too low.
• 7c: Position is on grade.
Step
Description