
9
Technical data
Art.
0891 385 020
Max. water inlet pressure
8.6 bar
Max. water inlet temperature
65°C
Assembly
The installation must comply with the
local regulations on the laying of
pipework systems.
Only the backflow preventers
approved for the particular installation
may be used.
A pressure indicator must be installed on existing
shut-off elements which complies with the applicable
regulations on the laying of pipework systems.
Note
Any number of dosing units can be
combined.
Preparation
■
Remove the two locking screws
[2]
of the cover.
■
Remove the cover of the metering unit housing.
■
If several metering units are combined:
•
Remove plug
[14]
from all metering units
with the exception of the last metering unit.
•
Connect the inlet ports of upline units to the
hose connectors
[3]
of the downline units.
■
Hold the metering unit on the mounting surface
and mark the position of the mounting holes
[5]
for the mounting screws.
Two mounting screws are sufficient for up to four
interconnected metering units.
■
For wall mounting, drill holes of 6 mm diameter
at the marked points and insert the dowels
included in the scope of supply.
■
For mounting on a wooden surface, drill holes
of 3 mm diameter at the marked points.
■
Insert the mounting screws (included in the scope
of supply) through the mounting holes
[5]
.
■
Secure the metering unit.
■
Fit the cover and secure with the locking
screws
[2]
.
■
Remove the hose connector
[3]
.
■
Apply liquid sealant to the thread of the hose
connector.
■
Connect the water supply hose to the hose
connector
[3]
.
The connection can be freely selected by ex
-
changing the plug and hose connector.
■
Tighten the hose connector finger-tight.
■
Tighten the hose connector a further 1 1/2
turns.
Initial Use
Ensure that the technical data of the
device are not exceeded.
Set the Metering Rate
The metering rate is set via the appropriate measur-
ing probe.
■
Screw the appropriate measuring probe
[7]
into the inlet port
[6]
(selection, see table).
Connect the Metering Medium
■
Position the drum with the metering medium
max. 1.80 m below the metering unit (large
differences in height impair the injection behav-
iour).
■
Push ceramic weight
[9]
onto inlet hose
[8]
.
■
Insert the inlet hose with foot valve and ceramic
weight into the drum with the metering medium.
■
Shorten inlet hose
[8]
, if necessary.
■
Push inlet hose
[8]
onto inlet port
[6]
.
■
Push outlet hose
[11]
onto outlet port
[12]
.
■
Shorten the outlet hose, if necessary.
Operation
During operation, water flows through the mixing
controller, the metering medium is drawn in and
diluted.
Switching ON/OFF
■
Switching on:
Press push-button
[1]
.
■
Continuous operation:
Pull the tongue off
the push-button.
For continuous operation, turn the pressed push-
button
[1]
90° in clockwise direction.
■
Switching off:
Release push-button
[1]
or turn
locked push-button in anti-clockwise direction.
Summary of Contents for 0891 385 020
Page 3: ...1 2 4 6 8 5 3 9 10 11 13 14 12 7 3 I...
Page 49: ...49 2 14 3 5 6 3 5 2 3 3 1 1 2 7 6 1 80 9 8 8 8 6 11 12 1 1 90 1...
Page 51: ...51 2 0 bar...
Page 80: ...80 Adolf W rth GmbH Co KG W rth BG I 1 2 3 4 5 6 7 8 9 10 11 12 13 14...
Page 83: ...83 2 0 bar...
Page 96: ...96 Adolf W rth GmbH Co KG W rth RU I 1 2 3 4 5 6 7 8 9 10 11 12 13 14...
Page 97: ...97 0891 385 020 8 6 65 C 2 14 3 5 6 3 5 2 3 3 1 5 7 6 1 80 9 8 8 8 6 11 12 1 90 1 1...
Page 99: ...99 2 0...