background image

   

Understanding how the  

ESBE pump station works

Warm water is pumped from the heat source to the pump set 
and manifold assembly. If the floor heating system requires 
a top up of heated water, the mixing valve will allow more 
heated water into the system via the inlet or release cooled 
water back to the heat source via the outlet. From the flow 
bar, warm water is distributed to each loop of pipe via the 
adjustable flow gauges, returning via the valves into the 
return bar.

Once the room to be heated reaches the required 
temperature, the room thermostat sends a signal to switch 
the pump off and close the actuators (if actuators are fitted). 
This shuts off the water supply to the loops of pipe in the 
floor and therefore shuts off the heat supply.

Before assembly of manifold or pressure test, familiarise 

yourself with the way the manifold works and the various 

stages of assembly.

2

Flow Bar

Return Bar

Warm water from  

heat source enters

Cool water returns to the heat 
source for reheating

M11

ESBE Pump Station

✆ 

0800 083 2677

              

www.wundatrade.co.uk

THE BRAND YOU CAN TRUST

Revision date: 26-4-2018

Summary of Contents for ESBE

Page 1: ... to 70 o C This guide is specific to our ESBE temperature control pump station and should be used in conjunction with the relevant Manifold user guide 1 Top pump connector and flow temperature gauge 2 Circulating pump and washers 3 bottom connector with return temperature gauge 4 ESBE temperature control valve Small ESBE valve illustrated M11 ESBE Pump Station 0800 083 2677 www wundatrade co uk TH...

Page 2: ...alves into the return bar Once the room to be heated reaches the required temperature the room thermostat sends a signal to switch the pump off and close the actuators if actuators are fitted This shuts off the water supply to the loops of pipe in the floor and therefore shuts off the heat supply Before assembly of manifold or pressure test familiarise yourself with the way the manifold works and ...

Page 3: ...onnections at this stage Remove top and bottom pump holder adaptors from the pump holders Screw the pump holder adaptors into the left hand end Flow and Return bars tighten adaptors ensuring rubber O rings are in place and seated correctly against manifold bars forming a water tight seal 3 Assemble bottom pump holder by connecting the return temperature gauge ESBE mixing valve and pump connector M...

Page 4: ...ould be set in accordance with the correct manifold user guide The manifold and pump set can now be filled with water and commissioned in accordance with our user guide video manifold pressure testing MO4 Ensure the pump is filled and vented set floor heating to call for heat and then select desired pump setting in accordance with pump user guide A good practice is to fit isolation valves when ins...

Page 5: ...an a domestic central heating system The Code recognises that it is not possible to clean a system without the application of a cleanser Different products may be used depending on the nature of the system involved The most effective corrosion inhibitors act by reacting with the surface of the metal to produce a protective film in the form of a stable complex The effectiveness of a given corrosion...

Page 6: ...6 Your Notes Tech support opening hours are subject to change please visit our website for the latest information Revision date 26 4 2018 ...

Reviews: