5.2.5 Calibration points
Calibration can be performed using one to five buffer solutions in any order
(single-point to five-point calibration). The meter determines the following
values and calculates the calibration line as follows:
25. Set the nominal buffer value for the measured temperature with
<
S
S
S
S
><
T
T
T
T
>
.
26. Accept the calibration value with
<ENTER>
.
The calibration display for the next buffer appears (voltage display).
27. If necessary, use
<M>
to finish the calibration.
The calibration record is displayed.
or
Continue calibrating using the next buffer with
<ENTER>
.
After the fifth buffer has been measured the calibration is automat-
ically finished. Then the calibration record is displayed.
The calibration line is determined by linear regression.
Calibration
Determined val-
ues
Displayed calibration data
1-point
Asy
z
Zero point =
Asy
z
Slope = Nernst slope
(-59.2 mV/pH at 25 °C)
2-point
Asy
Slp.
z
Zero point =
Asy
z
Slope =
Slp.
3-point to 5-
point
Asy
Slp.
z
Zero point =
Asy
z
Slope =
Slp.
The calibration line is calculated by