
4
put in the corresponding holes on the wing board according the size of
them. The two supporting wheels must be installed symmetrically or else
it will cause mold and mechanism damaged.
3. After having placed the work piece cover the upper wing board. First,
use fast pump to make bending mold press the work piece the use slow
pump to hold work piece at a suitable angle. When the work piece is
bended turn on the switch and the working piston will be reset
automatically to turn over the upper wing board to take out the work
piece.
4. Note
1. Check the oil position in the fuel tank before using. If it is not
enough, please fill the oil.
2. Please turn off the switch before operating, otherwise, the pressure
will not go up and loose the oil screw to make fuel tank ventilated.
3. The size of work piece must fit the groove in mould. If it is not fit,
it will cause work piece shrunken or make the mould splited.
4. For welding the tube, make sure the welding line be away from
bending position. In case of bending the two supporting wheel must be
revolved at once and the work piece must be slid in the groove of
supporting wheel. Otherwise the operation must be stopped.
5. Please keep the machine clean after using. The lubricant must be
filtered with 80# mesh and the filter must be clean regularly.
6. 15# lubricant is available for this machine.