Original Operating Instructions
BATD0100-ES-1-480-1 (Outdoor)
Commissioning
O_BATD0100-ES-1-480-1_(Outdoor)_V2.2_US
Page
82
of
110
6.1 Preparing for Commissioning
Prerequisite:
•
Conditions for operation shall be fulfilled (Section 13.2).
Procedure:
1.
Ensure
that the Enable switch is pressed.
2.
Ensure
that the product is de-energized.
3.
Ensure
that all fuses are inserted (Figure 11).
4.
Ensure
that the motor protecting switch (-F31) is in position
I
5.
Ensure
that the sliding switch at the DC circuit breaker is in position
AUTO
.
6.
Ensure
that the AC circuit breaker is in position
OFF
.
7.
Ensure
that all cables and lines are in flawless condition.
8.
Connect
the PE conductor (Section 5.5.1.1).
9.
Connect
the supply voltage (Section 5.5.1.4).
10.
Connect
the batteries to the corresponding terminals (Section 5.5.1.3).
11.
Connect
the product to the grid (Section 5.5.1.2).
12.
Check
that the screws on all connections and terminals have the correct
torque.
Summary of Contents for BATD0100-ES-1-480-1