5.5.1.2 AC Connection
Prerequisites:
•
All grid parameters must be fulfilled (Section 13.2.1)
•
Only one cable grommet for AC connection is available (Figure 20).
Figure 22: AC connection (-X14)
Pos.
Description
1
PE conductor connection
2
L1 phase connection
3
L2 phase connection
4
L3 phase connection
5
Neutral conductor connection
6
Cable clamp
7
Cable entry grommet
Procedure:
1.
Observe
the sequence (Figure 22).
2.
Route
the cables through the cable entry grommet.
3.
Connect
the cables for L1, L2, L3, N to the corresponding terminals
(-X14).
4.
Tighten
the screws with a torque of
20 Nm
(177 lb-in). The terminals are
suitable for conductor cross-section from min.
35 mm
2
(0.056 sq.in.) to
max.
95 mm
2
(0.147 sq.in.).
5.
Fix
the cables with a cable clamp.