GB
27
Wilh. Schlechtendahl & Söhne GmbH & Co. KG
Sliding door system for single and double leaf glass doors with SOFT-STOP
Before assembly
Tools required
Hammer drill
HSS concrete or masonry drill bits Ø5 and
Ø8 mm
Spirit level
Allen key, 2,5; 3 and 4 mm
Torque wrench 4 mm bit
Ring spanner 13 mm
extended SW3 bit
1/4” ratchet for extended SW3 bit
Preparation
Fixing material:
Suitable fixing material is required to install
the sliding track.
ATTENTION! Use only fixing material
suitable for floor, wall or ceiling properties!
The fixing material must be flush in the re-
spective countersunk holes! The screw heads
must not protrude from the sliding track!
ATTENTION! Before assembly, remove
silicone and oil from glass surfaces in area of
clamp using glass cleaner.
ATTENTION! Use of glass with a struc-
tured surface (except glass with etched finish),
or glass with high fluctuation in the glass
thickness is permissible only after applying a
pressure-neutral compensation layer.
Glass with self-cleaning coatings/surfaces is
not suitable for use with sliding door fittings.
Note: Satinised glass causes operating noises
in the area of the floor guide. We recom-
mend self-adhesive felt strips (not included in
delivery).
Ø5 + Ø8
SW2,5/3/4
extended SW3 bit
SW13
SW4
1/4“ ratchet