B
B
C
C
View from underside
View from underside
H
G
G
H
Step 1.
Seat dowel
(F)
into holes in
both end panels
(B)
as shown.
Step 2.
Seat cam dowel
(G)
into
holes in both end panels
(B)
as shown.
DOWEL (F)
& CAM DOWEL (G)
LOCATION DETAIL
Step 3.
Carcass construction
Attach panels
(C)
&
(E)
to panels
(B)
,
using cam dowel
(G)
& cam lock
(H)
(in
blue
),
and also using Dowels
(F)
(in
orange
) in positions as shown.
NB. All
CAM LOCK (H)
are to be positioned facing
the outside of the unit carcass, for ease of tightening.
Step 4.
Join panels
(C)
&
(E)
to
(B)
.
Insert cam lock
(H)
.
Do NOT tighten until Step 6.
Seat
(G)
cam dowel
into hole
as shown
Do
not
use power tools with
cam dowel
(G)
or cam lock
(H)
B
E
E
C
B
C
G F
F
G
G F
F
G
B
G
F
F
G
G
F
F
G
B
G
F
F
G
F
F
G
F
F
G
F
F
For Internal Use: FI.WR.INS.040_WKIN00140_Tower_300-600_2Dr6Shelf_Rev2.indd
Page 2
TOWER UNIT
300 600 2 Door 6 Shelf
Assembly Guide
Summary of Contents for TOWER UNIT
Page 8: ......