MRTA8-DC3: #35121AUS
Rev 5.0/2-21
8
2.4) Use the hoisting equipment to remove the lifter from the shipping container. Avoid
damaging the vacuum pads.
3B
3A
3)
3C
3D
Connect the electrical connectors (figs. 3A-B and
figs. 3C-D).
Install the 9-volt battery for the notification
buzzer as directed in
.
4)
4A
Assemble the pad frame for optimal load support
). Remove
the pad covers (fig. 4A) and save them for future use.
5) Perform tests as required under
.
ASSEMBLY