
19
CS200
Control Systems
Table 3.0 Annual Maintenance Schedule
In addition, inspection and preventive maintenance should also be performed on the freezer and its
mechanical parts. Refer to owner’s manual for details.
If any intermittent alarm or defect with the Cryostorage System is observed or suspected, it should be
investigated and remedied immediately even if this falls outside of the normal maintenance schedule.
CS200 SERIES Control
Examine for exposure to moisture, wear and tear, connector problems, and
damage to the faceplate or buttons. In addition, periodic firmware updates
may be important
Harness Assembly
Examine for damage to the cable and damage to connectors,
Battery
Examine connection cable and connector for damage. Examine vinyl
cover for damage. Replace every 3 years
Solenoid Valve
Examine wires and connector for damage. Replace every 2 years.
Lid Switch
Examine lid switch pickup and wires for damage. Replace if necessary
Level Sensor Assembly
Examine for damage to wires and connector. Replace every 3 years
Thermocouple Assembly
Examine for damage to wires and connector.
Operation
Summary of Contents for CS200
Page 2: ......