![Workrite Ergonomics Sequoia SQ-422 Assembly Instructions Manual Download Page 3](http://html1.mh-extra.com/html/workrite-ergonomics/sequoia-sq-422/sequoia-sq-422_assembly-instructions-manual_997241003.webp)
A
Extension Pole
Qty: 1
BB
Pole Coupler
Qty: 1
B
Cable Manager
Qty: 1
K
Outside VESA Mount
Qty: 2
C
Collar
Qty: 1
F
VESA Mount Knob
Qty: 2
E
Plastic Washer
Qty: 2
D
Ratchet Lever
Qty: 3
L
Wing Bar
Qty: 2
Extension Pole carton, 2 monitors:
Hardware Packs:
G
M5 × 4mm Set Screw for
Collar
Qty: 3
H
M4 × 8mm VESA Mount
Screws
Qty: 8
I
2.5mm Hex Wrench
Qty: 1
Verify that you have all the hardware and tools needed for the assembly.
Check your packages against the parts list above to verify that you have all the parts needed. You will
also need the following tools:
#3 tip Phillips screwdriver