Workrite Sequoia
Assembly Instructions for
Model SQ-101
#1500200 - Rev A
Page 1: ...Workrite Sequoia Assembly Instructions for Model SQ 101 1500200 Rev A...
Page 2: ...mmet Bolt Qty 1 I 2 5mm Hex Wrench Qty 1 S 6mm Hex Wrench Qty 1 S 6mm Hex Wrench Qty 1 X Grommet Clamp Plate Qty 1 G M5 4mm Set Screw for Desk Mount Qty 3 I 2 5mm Hex Wrench Qty 1 Capped Pole carton 1...
Page 3: ...Base T over the rear edge of the workstation Attach the Clamp Bracket to the Clamp Base with 4 M6 10mm Alan Cap Bolts V and tighten with 6mm Hex Wrench S Grommet Mount Note A grommet hole or small dri...
Page 4: ...a 2 Phillips screwdriver a Important Note It is strongly recommended to use the mounting screws provided by the monitor manufacturer if possible Always use the shortest screws possible to avoid damag...
Page 5: ...riteergo com 5 Workrite Sequoia Monitor Arm Assembly Instructions Attach Center Monitor to Pole 4 Place Center VESA Mount J on Pole and rest on collar C a b Install Ratchet Lever D into the rear of th...
Page 6: ...o hard to tilt adjust the tension adjustment on top of the Monitor Mount Use the 2 5mm Hex Wrench I clockwise to increase lift counter clockwise to decrease lift Check the monitor and adjust again as...