background image

6 of 10  

Workrite Ergonomics  |  800.959.9675  www.workriteergo.com

Attach Control Box & Cable Spools to Worksurface

Position Control Box (H).
If you have a Workrite worksurface:  

Locate the two pilot holes for the Control Box and proceed to 

Step 6b.

If you do not have a Workrite worksurface:  

Place Control Box (H) in position and use a pencil to mark pilot hole placement. Control Box should be placed 

towards rear center of worksurface as shown. Remove Control Box and drill pilot holes where marked.
Do not drill all the way through worksurface!
With Control Box (H) positioned over pilot holes, attach with two #12 × ¾" Pan Head Screws (G).
Attach Cable Spool (I) with the #12 × ¾" Pan Head Screw (G) to underside of worksurface. If you do not have a 

Workrite worksurface, mount Cable Spools (I) in a convenient location between Legs and Control Box. 

Attach Feet (sold separately)

Refer to foot kit instructions for steps to install your feet.

a

a

b

c

c

c

b

6

G

G

G

H

G

5

I

I

G

  #12 × ¾" Pan Head 

Laminate Top Screw 

Hardware at actual size

 

  #M6 × 12 mm Flat Head Cap 

Screw

Hardware at actual size

Note! 

Only use the #M6 × 16 mm Flat Head Cap 

Screw from the Foot Kit for assembly.

Summary of Contents for Essentia ES2E30-48

Page 1: ...y 1 I Cable Spool Qty 2 J 3 16 White Leg Cable Loops Qty 10 A Legs Qty 2 B Short Bracket Qty 4 HControl Box Qty 1 C Left End Bracket Qty 1 D Right End Bracket Qty 1 E M6 12 mm Flat Head Cap Screw Qty...

Page 2: ...reduce the risk of electric shock always unplug this Essentia Workcenter from the electrical outlet before cleaning WARNING To reduce the risk of burns fire electric shock or injury to persons 1 Unplu...

Page 3: ...Allen Wrench F Attach Left End Bracket C to sides of the other Leg A with Flat Head Cap Screws E using 4 mm Allen Wrench F Tighten securely Note The right bracket will be on your left and vice versa...

Page 4: ...holes in worksurface Attach at the four corner locations using 12 Pan Head Laminate Top Screws G If you use an electric screwdriver be sure it is on the lowest torque setting to avoid stripping the h...

Page 5: ...corner locations using 12 Pan Head Laminate Top Screws G If you use an electric screwdriver be sure it is on the lowest torque setting to avoid stripping the holes in the top With frame set positioned...

Page 6: ...pilot holes where marked Do not drill all the way through worksurface With Control Box H positioned over pilot holes attach with two 12 Pan Head Screws G Attach Cable Spool I with the 12 Pan Head Scre...

Page 7: ...tch and the control box Attach White Leg Cable Loops J to underside of worksurface using 12 Pan Head Laminate Top Screw G as needed for your model Attach Switch Refer to switch instructions for steps...

Page 8: ...ct the Leg Cable A to the six position leg ports M1 M2 on the Control Box H Insert the Switch Cable into the switch port HS on the Control Box H Insert the Power Cord L into the power port on the Cont...

Page 9: ...djust Feet Glides If necessary adjust leveling glides on the feet to level the worksurface Unscrew to increase height screw in to decrease height You must complete this initialization step or your wor...

Page 10: ...10 of 10 Workrite Ergonomics 800 959 9675 www workriteergo com 1500240 Rev D...

Reviews: