background image

Workrite Ergonomics  |  800.959.9675  www.workriteergo.com 

1 of 10

Box 1: 6608716-2PK-01

Box 2: 4435511-01

Parts Included, Frame Set

Required & Sold Separately

F

  4 mm Allen Wrench 

Qty: 1

L

  Power Cord 

Qty: 1

I

 

Cable Spool 

Qty: 2

J

  3/16" White Leg Cable Loops 

Qty: 10

A

 Legs  

Qty: 2

B

  Short Bracket 

Qty: 4

H

  Control Box  

Qty: 1

C

  Left End Bracket 

Qty: 1

D

  Right End Bracket 

Qty: 1

E

  #M6 × 12 mm Flat Head Cap Screw 

Qty: 12

K

  #8 × ⅝" Pan Head Screw 

Qty: 10

G

  #12 × ¾" Pan Head 

Laminate Top Screw  

Qty: 40

Assembly & Installation Instructions:

Essentia 2-Leg Workcenter ES2E30-48, ES3E30-48

Foot Kit 

Basic or Programmable Switch 

Top

Summary of Contents for Essentia ES2E30-48

Page 1: ...y 1 I Cable Spool Qty 2 J 3 16 White Leg Cable Loops Qty 10 A Legs Qty 2 B Short Bracket Qty 4 HControl Box Qty 1 C Left End Bracket Qty 1 D Right End Bracket Qty 1 E M6 12 mm Flat Head Cap Screw Qty...

Page 2: ...reduce the risk of electric shock always unplug this Essentia Workcenter from the electrical outlet before cleaning WARNING To reduce the risk of burns fire electric shock or injury to persons 1 Unplu...

Page 3: ...Allen Wrench F Attach Left End Bracket C to sides of the other Leg A with Flat Head Cap Screws E using 4 mm Allen Wrench F Tighten securely Note The right bracket will be on your left and vice versa...

Page 4: ...holes in worksurface Attach at the four corner locations using 12 Pan Head Laminate Top Screws G If you use an electric screwdriver be sure it is on the lowest torque setting to avoid stripping the h...

Page 5: ...corner locations using 12 Pan Head Laminate Top Screws G If you use an electric screwdriver be sure it is on the lowest torque setting to avoid stripping the holes in the top With frame set positioned...

Page 6: ...pilot holes where marked Do not drill all the way through worksurface With Control Box H positioned over pilot holes attach with two 12 Pan Head Screws G Attach Cable Spool I with the 12 Pan Head Scre...

Page 7: ...tch and the control box Attach White Leg Cable Loops J to underside of worksurface using 12 Pan Head Laminate Top Screw G as needed for your model Attach Switch Refer to switch instructions for steps...

Page 8: ...ct the Leg Cable A to the six position leg ports M1 M2 on the Control Box H Insert the Switch Cable into the switch port HS on the Control Box H Insert the Power Cord L into the power port on the Cont...

Page 9: ...djust Feet Glides If necessary adjust leveling glides on the feet to level the worksurface Unscrew to increase height screw in to decrease height You must complete this initialization step or your wor...

Page 10: ...10 of 10 Workrite Ergonomics 800 959 9675 www workriteergo com 1500240 Rev D...

Reviews: