
INSTALLATION,OPERATION & MAINTENANCE
INSTALLATION,OPERATION & MAINTENANCE
INSTALLATION,OPERATION & MAINTENANCE
INSTALLATION,OPERATION & MAINTENANCE
Woodson Salamander– WGLS30
Tel: 1300 79 1954 Web: www.stoddart.com.au Email: [email protected]
Due to continuous product research and development, the information contained herein is subject to change without notice
Page 13
WARNING!
If any electrical wires are damaged, the unit must NOT be switched
ON until the parts have been fixed as injury or death can occur.
Maintenance
Routines
Schedules
•
To maintain optimal performance, maintenance and cleaning schedules must be regular and thorough.
•
The unit should be cleaned at the end of the
every work day
.
Log Books
•
Log books should be kept for all cleaning and maintenance of this unit.
Inspection
•
Surfaces should be checked at least
once a week
for damage or deterioration.
•
As part of the maintenance, a
qualified technician MUST
check the controls, mechanical parts and
electrical wiring for damage, deterioration or need of adjustment.
Faults
•
Not repairing small faults immediately can cause a complete breakdown. If any small faults occur, have
them attended to promptly by a
qualified technician
.
•
All faults should be reported to the distributor and manufacturer.