
Page 6
Installation
Plumbing Connections
•
The unit is supplied with 15mm tap-style rear drain for fast and safe draining
•
Unit must be drained DAILY to a bucket or to a tundish via a hose
Information
Refrigeration Connections
•
All refrigeration lines are pressurised with nitrogen before leaving the factory� Exported units are de-pressurised before shipping to a
country other than Australia
•
Refrigeration lines are tested at 1725kPa (250psi) for 24 hours in the factory� For safety, the pressure is reduced before leaving the factory
•
Before use, the system MUST be checked for leaks� Check the pressure tag attached to the refrigeration lines� If the pressure tag is lost,
the preset pressure of the lines when leaving the factory should be 1380kPa (200psi)� Contact the manufacturer to confirm
•
Any pressure loss MUST be reported to the distributor or manufacturer and fixed before the unit is used
•
If exported, the system MUST be tested again for 24 hours before attaching the external refrigeration lines
•
The TUA or TUAE TX valve is supplied with the unit� Check the specification manual for more information
•
Ensure the TX valve is working properly before use
•
This unit designed for R507 refrigerant�
Pre-Installation Pressure Test
TX Valves
Refrigerant
IMPORTANT
This refrigeration system must be installed in accordance with
local refrigeration standards
IMPORTANT
This unit must be installed in accordance with AS/NZ 3500.1
IMPORTANT
This unit must be operated on potable water. If the water has a
high mineral content, pretreatment may be necessary or your
warranty could be voided.
Summary of Contents for W.CFC23
Page 2: ...Page Intentionally Left Blank...
Page 19: ...Page 18 Notes...