2.4) Use the hoisting equipment to remove the lifter from the shipping container. Avoid
damaging the vacuum pads.
3B
3A
3)
3C
3D
Connect the electrical connectors (figs. 3A-B and
figs. 3C-D).
If the lifter has a notification buzzer, install the 9-
volt battery as directed in “N
4)
4A
Assemble the pad frame for optimal load support
page 9). Remove the pad covers (fig. 4A) and save them
for future use.
5) Perform tests as required under “T