Woodline SHELL BASE KIT Manual Download Page 3

  Distributor: ShadeScapes Americas    TEL: 970.527.7070    www.shadescapesusa.com     [email protected]   © PROTRADE & WOODLINE cc. 2010

www.woodline.co.za

3|4

WOODLINE 
SHELL BASE KIT 
800 x 800 mm (31.5“ SQ)
ASSEMBLY INSTRUCTIONS 

 

STEP 15

STEP 14

STEP 13

STEP 9

STEP 10

STEP 11

STEP 12

OR

COMPACT CONCRETE MIX & SCRAPE ACROSS THE 
SURFACE TO ENSURE CONCRETE DOES NOT 
PROTRUDE ABOVE BOTTOM OF THE BASE.

USE A DAMP CLOTH AND WIPE THE METAL RIM 
AREA CLEAN.   

LEAVE CONCRETE TO SET BEFORE YOU CONTINUE 
TO STEP 12. (THIS SHOULD BE FOR 24-48 HOURS)    

CAREFULLY TURN THE SHELL BASE OVER.
(YOU WILL REQUIRE ASSISTANCE OF AT LEAST
ONE OTHER PERSON AS THE WEIGHT IS +/- 230 lbs.    

UNSCREW THE CENTER M10 BOLTS

UNSCREW THE M8 BOLTS ON THE RIM OF BASE

ATTACHE THE HANDLES USING THE M8 BOLTS AS 
INDICATED IN THE DIAGRAM. ENSURE THE BOLT 
ARE PROPERLY SECURED. HANDLES ARE USED FOR
LIFTING & MOVING OF SHELL BASE. 

OR SCREW IN M8 SKIFFY PLUGS IN IF THE SHELL 
BASE IS IN THE REQUIRED POSITION.

Reviews: