Woodline PE35SAS Assembly Instructions Manual Download Page 2

13

4

5

6

7

1

1

14

2

2

3

3

7

7

8

2/6

STEP 1:

 

Remove all bolts at ends of vertical   and horizontal 
poles  . Push small end of rubber seal   onto end of 
pole with winch box. Connect base sleeve and vertical pole 
with winch box as illustrated, and fasten bolts with washers. 
Then slide the rubber seal down over the short section of 
base sleeve. Wetting the inside of the rubber seal with dish 
soap will make it easier to slide over the pole.

STEP 3:

 

As illustrated, push small end of rubber seal   onto 
horizontal pole  , slide into elbow and fasten with bolts 
and washers. Slide rubber seal over elbow to seal joint.

STEP 5:

 

Insert winch handle   into winch box and unwind cable by 
rotating winch handle counter-clockwise, ensuring that you keep

 

cable tensioned

 while unwinding/spooling

. Then guide cable 

over the pulley through the opening in the pulley housing.

NOTE: 

Assemble your umbrella base before assembling the Pendulum structure.

NOTE: 

Spigot   tube is required when assembling base – to be found in 

Structure Fittings Box.

STEP 6:

 

Two people are needed to lift and slide the fully assembled 
vertical and horizontal poles onto the spigot 

2 x nylon washers installed

at the base of the spigot

.

STEP 4:

 

As illustrated, push canopy clip bracket   onto 
horizontal pole   and fasten with bolts and washers 
on bottom side.

STEP 2:

 

Push elbow   onto top end of post  , then fasten 
bolts with washers on both sides.

www.woodlineshade.com  Toll Free 1 – 800 – 260 – 0617

STEP 4

STEP 3

STEP 2

STEP 5

STEP 1

13

13

14

14

14

1

7

7

2

8

3

8

PENDULUM 06/12/17

Reviews: