![Woodline PE35SAS Assembly Instructions Manual Download Page 2](http://html1.mh-extra.com/html/woodline/pe35sas/pe35sas_assembly-instructions-manual_995091002.webp)
13
4
5
6
7
1
1
14
2
2
3
3
7
7
8
2/6
STEP 1:
Remove all bolts at ends of vertical and horizontal
poles . Push small end of rubber seal onto end of
pole with winch box. Connect base sleeve and vertical pole
with winch box as illustrated, and fasten bolts with washers.
Then slide the rubber seal down over the short section of
base sleeve. Wetting the inside of the rubber seal with dish
soap will make it easier to slide over the pole.
STEP 3:
As illustrated, push small end of rubber seal onto
horizontal pole , slide into elbow and fasten with bolts
and washers. Slide rubber seal over elbow to seal joint.
STEP 5:
Insert winch handle into winch box and unwind cable by
rotating winch handle counter-clockwise, ensuring that you keep
cable tensioned
while unwinding/spooling
. Then guide cable
over the pulley through the opening in the pulley housing.
NOTE:
Assemble your umbrella base before assembling the Pendulum structure.
NOTE:
Spigot tube is required when assembling base – to be found in
Structure Fittings Box.
STEP 6:
Two people are needed to lift and slide the fully assembled
vertical and horizontal poles onto the spigot
2 x nylon washers installed
at the base of the spigot
.
STEP 4:
As illustrated, push canopy clip bracket onto
horizontal pole and fasten with bolts and washers
on bottom side.
STEP 2:
Push elbow onto top end of post , then fasten
bolts with washers on both sides.
www.woodlineshade.com Toll Free 1 – 800 – 260 – 0617
STEP 4
STEP 3
STEP 2
STEP 5
STEP 1
13
13
14
14
14
1
7
7
2
8
3
8
PENDULUM 06/12/17