Assemble the Ladder, so the 
Ladder Steps are the same 
distance apart as shown in the 
diagram. The Ladder Legs should 
be pushed right up to the grooves 
in the Ladder steps, so the ladder 
doesn’t rock.

Step 5

8 x 80mm Coach Screws

274mm

327mm

327mm

327mm

307mm

15

22

15

22

22

22

We strongly recommend pre drilling 

holes before fixing screws.

Step 6

1 x 80mm Coach Screw

Stand the main assembly up 
and attach the Ladder to the 
inside of one of the Posts, the 
Ladder end should be flush 
with the Base.

We strongly recommend pre drilling 

holes before fixing screws.

Don’t climb the ladder yet as 
the assembly isn’t secure. With 
the aid of a step ladder attach 
an Over Bar to the inside of the 
Posts, adjacent to the top of the 
Rails. Fix using a bolted 
connection and a 100mm 
screw into each post.

Attach the Short Post to the 
other side of the ladder using  
a coach screw and a bolted 
connection and a 100mm 
screw into the Base and Over 
Bar. 
Attach the Under Support 
between the posts flush with 
the top of the base. using 
50mm screws

Step 7

18

4 x Bolted Connections
1 x Coach Screw

14

17

9

2

4  x 100mm Screw

3  x 50mm Screw

We strongly recommend pre drilling 

holes before fixing screws.

Step 8

8 x 80 mm Coach Screws
4 x Bolted Connections

Place 2 short posts flat on the 
ground, parallel to each other and 
1375mm apart. Attach the Long 
Skirting to the ends flush with the 
bottom and sides of the Posts 
using 4 Bolted Connections per 
Skirting board.  Attach the long 
rail to the posts as shown in the 
diagram,  flush to the top of the 
Posts, using 8 Coach Screws per 
Rail.

12

12

We strongly recommend pre drilling 

holes before fixing screws.

Summary of Contents for 02GRFF4118-V1

Page 1: ...To ensure the longevity regarding the colour of any plastic objects attached to this product we suggest such items are positioned away from constant direct sunlight Any modifications that are made to this product i e Adding another unit should be carried out according to the manufactures instructions This product is delivered pressure treated with a water based treated Maintenance Maintenance shou...

Page 2: ...Slide Support 27x70x500mm QTY 1 25 Nail Bag Ironmongery 50mm Screw x 31 80mm Coach Screws x 58 Bolted Connections x 51 60mm Screw x 50 30mm Screw x 6 Corner Brace 375mm x 44mm x 58mm QTY 12 Roof Trim 1633mm x 30mm x 12mm QTY 1 27 Roof Trim 1633mm x 45mm x 12mm QTY 1 28 26 Bolted Connection When attaching the bolt and the connection ensure that the connection itself sits flush with the face of the ...

Page 3: ...ntrally against the Medium posts as shown in the diagram The Big Base should be fixed with 27mm overhang either side of the post and 1430mm from the bottom of the posts to the top of the base Fix the Big Base to the Posts from the outside of the Posts into the Base using a bolted connection and a 100mm screw Step 2 2 x Bolted Connections 1 2 x 100mm Screw We strongly recommend pre drilling holes b...

Page 4: ...f the Rails Fix using a bolted connection and a 100mm screw into each post Attach the Short Post to the other side of the ladder using a coach screw and a bolted connection and a 100mm screw into the Base and Over Bar Attach the Under Support between the posts flush with the top of the base using 50mm screws Step 7 18 4 x Bolted Connections 1 x Coach Screw 14 17 9 2 4 x 100mm Screw 3 x 50mm Screw ...

Page 5: ... step 7 Once central to the opposing base secure through the framing on the underside of the small base into the step Step 10 3 x Bolted Connections We strongly recommend pre drilling holes before fixing screws 6 6 12 x Bolted Connections 16 x Coach Screws Attach the two Long Skirt ings to the edges of the posts as shown in the diagram using bolted connections Attach the Short Rails as shown in th...

Page 6: ...ch a handle to the inside of the uprights at the slide side handle supports the bottom fixing should be 100mm above the base We strongly recommend pre drilling holes before fixing screws Step 14 Step 15 Step 16 Attach both Roof panels to the assembly in the previous step as shown 12 x 50mm Screws 7 7 We strongly recommend pre drilling holes before fixing screws Place the Slide centrally between th...

Page 7: ...h the front and back posts resting on the Roof Supports Bolt the Roof in place from the Fascias into the Posts 4 x Bolted Connections We strongly recommend pre drilling holes before fixing screws Dig holes 400mm into the ground where the Ground Anchors will be positioned Place the anchor into the ground and bolt to the inside of of the four outer Posts Fill the ground back in making sure the groun...

Page 8: ... skirting into the brace 48 x 60mm Screws 26 After completing assembly using a sanding block suitable mechanical sander sand off any sharp corners or rough areas of timber We strongly recommend pre drilling holes before fixing screws Step 21 Fix the two roof trims to the top of the roofs creating a V shape to cap the roof and fix in place with 30mm screws 6 x 30mm Screws 27 28 ...

Reviews: