![Woodbridge T-0022 Installation And Care Manual Download Page 17](http://html1.mh-extra.com/html/woodbridge/t-0022/t-0022_installation-and-care-manual_994798017.webp)
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
www.woodbridgebath.com
16
R
WOODBRIDGE
INSTALLATION INSTRUCTION
Connect the water supply hose and turn on the
angle valve.Check if any leakage.
Turn on
The buzzer rings second "click" to show that
self-inspection is finished.
The water starts to flow into tank and
heating will take 3 minutes.
Heating
Water inlet
Wait for 3
minutes
Grounding pin
Grounded
outlet
CASE 2
Indicator light
Electric leakage test button
Protection switch
Press
protection
switch
NOTE:
CASE 1
Insert power plug into power socket.
NOTE:
If it’s not an electric leakage
protection plug, insert power
plug into power socket directly.
Water tank
Checking the power and water supply
If it’s an electric leakage protection
plug
,
press protection switch, indicator
light is on which means there is electricity.
Press electric leakage test button prior to
usage,protection switch bounces to show
that protection function works normally.
The main unit buzzer rings first “click”,
the power light and energy saver light will flash.
Power light on and energy saver light off means
self-inspection.