background image

 

PG 

12 

OF

 24

M0183.06   AUGUST 2019

Whatcom Gas-Fired Vertical Rotisserie CE  

Installation and Operation Manual

GAS SPECIFICATIONS

WS-GVR-10-(CT)-(DD)-CE-NG

EN 437 Gas Group

|

2H

|

2L

|

2HS

|

2ELL

|

2EK

Declared Input (kW)

33�7

33�7

33�7

33�7

28

Inlet Pressure (mbar)

20

25

25

20

20/25

Declared 
Pressure at  
Gas Valve 
Outlet (mbar)

IR Burners

SV-2, 3

12�5

12�5

12�5

12�5

12�5

Radiant 

Burner 

SV-1

8�7

8�7

8�7

8�7

8�7

WS-GVR-10-(CT)-(DD)-CE-LP

EN 437 Gas Group

|

3+

|

3B/P

|

3B/P

|

3P

Declared Input (kW)

40�5

40�5

40�5

38�0

Inlet Pressure (mbar)

28-30/37/50

*

30/37

*

50

*

30/37/50

*

Declared 
Pressure at  
Gas Valve 
Outlet (mbar)

IR Burners

SV-2, 3

25

25

25

25

Radiant 

Burner 

SV-1

22�5

22�5

22�5

22�5

NATURAL GAS (NG)

Gas Supply and Pressure 

PROPANE (LP)

Gas Supply and Pressure 

SCOPE OF APPROVALS 

G20 @ 20 mbar - I

2H(20)

 - 

AT, DK, ES, FI, IE, IT, PT, GB, SE, CH, GR, EE, LV, SI, HR, SK and CZ

G25 @ 25 mbar - I

2L(25)

 - 

HU

G20 @ 25 mbar - I

2HS(25)

 - 

HU

 

G20 @ 25 mbar - I

2ELL

 - 

DE

G20/G25.3 @ 20/25 mbar - I

2EK(20/25)

 - 

NL 

* Propane (LP): Maximum inlet gas pressure to the rotisserie, 

after the external regulator, must not exceed 34 mbar (14" W.C. or 1/2 psi).

SCOPE OF APPROVALS 

G31 @ 37 mbar

*

 - I

3P(37)

 - 

BE, CH, CZ, ES, FR, GB, GR, HR, IE, IT, LT, NL, PL, PT, SI, SK, TR

G31 @ 50 mbar

*

 - I

3P(50)

 - 

AT, BE, CH, CZ, DE, ES, FR, GB, NL, SK

G30 @ 28-30 mbar, 37 mbar

*

 - I

3+(28-30/37)

 -

 BE, CH, CY, CZ, ES, FR, GB, GR, IE, IT, LT, PT, SI, SK, TR

G30 @ 30 mbar - I

3B/P(30)

 - 

AT, BE, CY, CZ, DE, DK, EE, FR, GB, HR, HU, IT, LT, NL, NO, PL, RO, SE, SI, SK

G30 @ 50 mbar

*

 - I

3B/P(50)

 - 

AT, CH, CY, CZ, DE, FR, SK

Summary of Contents for WHATCOM CE Series

Page 1: ...ATION 1801 W Bakerview Rd Bellingham WA 98226 USA WHATCOM CE Rotisserie Gas Fired Vertical Stand and Countertop Models European Models WHATCOM GAS VERTICAL ROTISSERIE WS GVR 10 CE NG LP WS GVR 10 DD CT CE NG LP DOC NO M0183 06 REVISED AUGUST 2019 Installation and Operation Manual ...

Page 2: ...CONTENTS Whatcom Vertical Rotisserie CE 3 Cautions Warnings 4 GVR Specifications 6 GVR CT Specifications 7 Installation Clearances 8 Installation 9 Utilities 10 Venting 11 Gas Specifications 12 Components Schematic 14 Controls 15 Operation 16 Cleaning 17 Maintenance 19 Optional Smoker Tray 20 Electrical Diagrams 21 Limited Warranty 23 ...

Page 3: ...anual WHATCOM VERTICAL ROTISSERIE CE Shown GVR 10 CE INSTALLATION AND OPERATION MANUAL FOR THE WOOD STONE WHATCOM VERTICAL ROTISSERIE ORIGINAL INSTRUCTIONS GAS FIRED ROTISSERIE GVR 10 DD CT CE NG LP CE MODELS FREE STANDING COUNTERTOP MODELS ADDITIONAL COPIES AVAILABLE UPON REQUEST Shown GVR 10 CT CE ...

Page 4: ...ON AND OPERATING INSTRUCTIONS FOR THE WOOD STONE GVR 10 DD CT CE NG LP WHATCOM GAS FIRED ROTISSERIE IMPORTANT Consult your local gas supplier for a statement outlining a procedure to be followed in the event you smell gas Post the statement in a prominent location READ ALL INSTRUCTIONS BEFORE INSTALLING AND USING THE APPLIANCE Please read this entire manual before you install the rotisserie Failur...

Page 5: ...be used by children aged from 8 years and above and persons with reduced physical sensory or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning use of the appliance in a safe way and understand the hazards involved Children shall not play with the appliance Cleaning and user maintenance shall not be made by children without supervi...

Page 6: ...M VIEW w bottom utility connections on optional rear door models 5 3 4 140mm 7 180mm 4 1 4 110mm 3 80mm 2 1 2 70mm Locking Casters This Side REV LEGEND PART WS GVR 10 Whatcom Rotisserie General Arrangement 4 13 2016 charleyh 7 DWN BY SHEET am WA 360 650 1111 www woodstone corp com DIMENSIONS ARE IN INCHES ERANCES LINEAR 1 2 10mm ANGULAR 2 UNLESS NOTED OTHERWISE ONGOING PROGRAM OF PRODUCT IMPROVEME...

Page 7: ...THIS DRAWING IS THE OLE PROPERTY OF WOOD STONE CORPORATION ONGOING PROGRAM OF PRODUCT IMPROVEMENT MAY REQUIRE US TO CHANGE SPECIFICATIONS WITHOUT NOTICE DATE 120 VAC 1 3A GD 1 1 2 GREASE DRAIN 1 of 1 FRONT VIEW AIR INTAKE SIDE VIEW G C AIR INTAKE REAR VIEW with standardutility connections shown PLAN VIEW 36 910mm 32 1 4 820mm R 26 3 4 680mm Door Swing 25 1 4 640mm G C AIR IN 27 1 2 700mm 30 760mm ...

Page 8: ...s must allow access all the way around and above unit as shown below Caster units must be able to roll completely free from obstructions to allow access as shown below 304mm DD 152mm CLEARANCES FRONT Allow 36 to allow for door swing and user access SIDES Minimum clearance from sides of rotisserie to combustible construction is 152mm 6 Minimum clearance from sides of rotisserie to non combustible c...

Page 9: ...tor and the quick disconnect device or its associated piping to limit the appliance movement Use the hole located on the left rear leg of the rotisserie cabinet to attach the restraining device s see photo to right COUNTERTOP MODELS TO SECURE THE ROTISSERIE TO THE COUNTER Remove the curb walls at the base of the unit to access the legs Fasten the unit to the countertop using the 9 5 mm 3 8 holes i...

Page 10: ...ors from abrasion WATER Cold water supply to the 8 mm 1 4 water inlet female at the back of the rotisserie Connect to a water supply with a pressure of 207 620 Kpa 30 90 psi DRAIN A 40 mm 1 1 2 drain outlet tube at the bottom of the rotisserie is provided This outlet must be connected to an indirect waste pipe and discharge by means of an air gap in accordance with all applicable plumbing codes Th...

Page 11: ...lue connection designed to be installed under an exhaust hood canopy The hood must be connected to a grease rated duct system The venting system must be designed and installed in accordance with all relevant codes pertaining to grease and smoke producing commercial cooking appliances Check with your local code official Airflow should be adjusted according to the requirements specified by the hood ...

Page 12: ...2 3 25 25 25 25 Radiant Burner SV 1 22 5 22 5 22 5 22 5 NATURAL GAS NG Gas Supply and Pressure PROPANE LP Gas Supply and Pressure SCOPE OF APPROVALS G20 20 mbar I2H 20 AT DK ES FI IE IT PT GB SE CH GR EE LV SI HR SK and CZ G25 25 mbar I2L 25 HU G20 25 mbar I2HS 25 HU G20 25 mbar I2ELL DE G20 G25 3 20 25 mbar I2EK 20 25 NL Propane LP Maximum inlet gas pressure to the rotisserie after the external r...

Page 13: ...oes not present any reduction in pipe diameter or other restriction Rotisserie issues caused by improper pipe sizing improper shut off valves restrictive connectors or any other deficiency in the gas supply design or installation will not be covered under the rotisserie warranty Countertop models may be hard piped if necessary GAS CONNECTION The gas control valves that operate the burners are loca...

Page 14: ...urner Circuit breakers Electrical assembly Drive motor Door switch rear door models only Wiring diagram attached to inside of right side as viewed from front access panel Electrical diagrams are also in the ELECTRICAL DIAGRAM section of this manual REMOVE REAR CORNER PANELS TO ACCESS GAS VALVES AND ELECTRICAL COMPONENTS Rear Corner Panels must remain removable for service Diagram shown with option...

Page 15: ... on the back to upper right of the doors on models with optional rear door START STOP JOG IR WATER NOTE Pressing the RED stop button at any time will stop drum rotation and turn off the burners FRONT CONTROLS REAR CONTROLS WITH OPTIONAL REAR DOOR Jog Start NOTE Opening the rear door if equipped will stop drum rotation and turn off the burners ...

Page 16: ...G button green button near the center of the front panel as necessary to rotate the drum when hanging the spits On units equipped with a rear door there is also a JOG button located on the back next to the door The drum will turn only while the button is depressed release the button to stop the rotation The burners do not fire when using the JOG function 7 Press the START button green button on th...

Page 17: ...e and allow the water to flow down the drain Remove the two Infrared IR Burner Reflectors at the base of each side IR Burner for cleaning Lift the center Flame Post Guard straight up off the Flame Post Scrape if necessary then wash by hand or in dishwasher With a warm damp cloth wipe up any grease remaining in the cabinet Then use a clean dry cloth to dry and polish the surface IMPORTANT Do not to...

Page 18: ...ly in sink using aproved dishwashing methods wash rinse sanitize Lift up and pull out the two IR Burner Reflectors If serious buildup place parts on sheet pan outside of rotisserie Scrape off debris with putty knife Ü Ü Ü Ü q w ROUTINE CLEANING PROCEDURE DO NOT wipe Flame Post Jets Scrape build up from Flame Post base with putty knife DO NOT allow debris into holes at Flame Post base DO NOT wipe I...

Page 19: ...ssary Periodically inspect the condition of the power supply cord Refer to the exhaust hood manufacturer s recommendations for inspection maintenance and cleaning TROUBLESHOOTING AND REPAIR IF YOU EXPERIENCE A PROBLEM WITH THE ROTISSERIE Make sure that the power cord is securely plugged into the rotisserie and a functioning electrical outlet Make sure the gas supply is connected to the rotisserie ...

Page 20: ...ut a half pound of wood chips to create smoke Properly managed it will provide smoke for approximately 45 minutes to 1 hour before needing wood replenishment CAUTION Keep the Smoker Tray covers on except when refilling CLEANING Remove the left and right side tray covers and scrape off the burnt on grease CAUTION Always consider the Smoker Tray and its contents to be very hot Use insulated gloves T...

Page 21: ...TS1 13 BN BK BU OR Note Remove Jumper Between TS1 7 And TS1 8 Optional Rear Door Y ICR ICFP ICL Whatcom Vertical Gas Rotisserie CE Electrical Diagram WA 1 360 650 1111 www woodstone corp com DATE DIAG WD 1 3 SHEET 1of Igniter Gas Valve FC FC GND V1 P1 TH W V2 Spark Sensor TH TR D D FLAME POST LEFT INFRARED RIGHT INFRARED TS1 10 TS1 14 Igniter Gas Valve FC FC GND V1 P1 TH W V2 Spark Sensor TH TR D ...

Page 22: ...13 14 15 1 2 3 4 5 M 1A Breaker 5A Breaker Transformer 230 VAC 24 VAC 150VA TS2 TS1 Relay 2 Relay 1 1 uF 1 10 HP 160 1 11 RPM Gear Motor Start Stop Jog IEC Connector Dual Ganged Potentiometer Rear Front BN Y Y OR R R R OR BU BU BK PK OR BN Y GN BK GY V W W W BK BK R R BU BK GN Y BN BK BK BN Remove Jumper On Rear Door Units BK Percent Timer PK ICL TH W ICFP TH W ICFP GND ICR GND ICR TH W R BK GN PK...

Page 23: ...such statements do not constitute warranties and are not part of the contract of sale This Limited Warranty constitutes the complete final and exclusive statement with regard to warranties THIS LIMITED WARRANTY IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES WHETHER WRITTEN ORAL OR IMPLIED INCLUDING BUT NOT LIMITED TO ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR PARTICULAR PURPOSE OR WARRANTY A...

Page 24: ...2019 Tel 1 360 650 1111 Fax 1 360 650 1166 www woodstone corp com WOOD STONE CORPORATION 1801 W Bakerview Rd Bellingham WA 98226 USA An ongoing program of product improvement may require us to change specifications without notice ...

Reviews: