LT15 Installation
LT15 Rev. E6.04+
3
3-1
WM doc 9/10/20
LT15 Installation
SECTION 3 LT15 INSTALLATION
WARNING!
Turn the base unit’s power to OFF, remove the key, and discon-
nect the battery ground terminal, if applicable.
On electric equipment, lock out power supply before performing any installa-
tion. See Electrical Lockout Procedures (OSHA regulation 1910.147, appendix
A reprinted in the Operator’s Manual).
Ensure your unit is on a level surface and secure from movement.
3.1
LT15 Rev. E6.04+
(Bed Sections Rev. G.00+): Kit SLRKIT-LT15.1 is required to mount the SLR.
1.
Place the rail adapter on the second and third bed rails of the first bed section as shown in FIG.
3-1.
2.
Slide the adapter against the bed rail stop blocks.
NOTE:
If the adapter contacts the log support first, raise the support to the
height of the adapter and use the log support as the side starting point.
FIG. 3-1
TDSLR03-02
Front of bed
Board stop
Log support
Board stop
Brace to front