
Sawmill Operation
Preparing The Sawmill For Towing
Sawmill Operation
HDSdoc072619
4-21
4
or autoclutch blade switch after reaching the destination to avoid deformation of the drive
belt.
12.
Hook the carriage safety chain located at the bottom of the carriage to the bracket at the
bottom of the mast.
See Figure 4-8.
CAUTION!
Check to be sure the saw head safety chain is secured
before towing the sawmill. Failure to properly secure the saw head can
result in severe machine damage. Be sure the blade housing and pul-
ley covers are in place and secure. Use the safety retainer pin and
cable to fasten blade housing covers.
13.
Remove all loose objects from the bed of the mill. Store the outrigger jack handle in the
bracket provided on the rear/loading-side outrigger guide.
14.
Place both fenders in the slots located behind the trailer tires and secure with rubber
straps. Raise all but the very front outrigger.
For Fine Adjust Outriggers (FAOs), be sure to adjust the outrigger base height so that the
grease fitting is just below the lowest outrigger hole before securing the FAO in position
with the lock pin.
CAUTION!
Be sure the outrigger base is adjusted properly before
securing the FAO in position with the lock pin. Failure to do so will
cause damage to the outrigger grease fitting.
CAUTION!
Do not adjust the FAO outrigger base height while there is
weight on the FAO. Damage to the FAO may result.
FIG. 4-8