
17
ASSEMBLY INSTRUCTIONS
YOKOHAMA
Put both bends with
connecting piece together
Fit clamps over down pipe and attache both
bends with connection piece to gutter.
ATTENTION:
Please cut the rainwater pipe to the correct
length BEFORE assembling it. The metal
clamps have to be slid onto the rainwater
pipe before mounting.
The unused hole must be sealed
with a rubber plug and the small
holes must be sealed with Hole
caps.
Secure the down pipe to the angle joint star-
ting from the top, then centre and last at the
bottom.
Für die Verschraubung wird dieselbe
Schraube verwendet, die bereits für
den Eckpfosten verwand wurde.
Bend
Drain
hole
Drain
pipe
Hole
cover
Hole
cover
Rubber
plug
Angle joint
Screw the three angle joints with short screws.
Gutter
Hole for
rainwater
Angle
joint
Angle
joint
Metal clamp for
rainwater pipe
Short
screws
Short
screws
Short screws
Angle joint
Bend
Rainwater
pipe
Connection
piece
Short
screws
SIDE VIEW
1
3
2
ASSEMBLY OF THE RAINWATER PIPE
In one or the other rain holes which you
ever wish can be used to fit the down pipe.
The other hole must be sealed with a rubber
plug.
Required accessories
Pce
no.
Article
Qty
-
Rainwater
pipe and
connec-
tion piece
1
-
Metal
clamp
and angle
joint
3
-
Bend
2
-
Short
screws
5
-
Rubber
plug, big
1
-
Hole
caps
2